HomeMy WebLinkAbout296981_4_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113395 PROJECT ADDRESS: 3201 S Halladay St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III-B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/24/2023 INITIAL REVIEW 1/29/2023 EXPIRATION 7/23/2023 RECHECKS: 1.4/16/23 PROJECT APPLICANT CONTACT PERSON: 2.5/30/23 Dave Gamboa 3.6/30/23 TEL: (714)597-5560 FAX: VALUATION: $100,000.00 EMAIL: aes.dave67@gmail.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Sheet A3: Provide section through the stairway to show rise and run, and to show minimum headroom clearance, contrasting stripe. No open riser is allowed. (11B-504)2nd Review Comment: The number of steps showed on the first and second floor did not match. Please provide building section through the stairway to show headroom above the stairway.3rd Review Comment: Stairway section on sheet 7 – For clarity, please clearly show where the section was cut through on the floor plans. A minimum of 6’-8” clear headroom is required above the stairway; it appears that the floor above occurred at the eighth tread of the stairway (see marked-up plan on sheet A7). 4th Review comment: Please show dimension of minimum 6’8” clear headroom at the stairway. Structural Review CommentSheet SW-1: New interior wall, referenced detail 1/SW-2 – Please provide detail to show attachment/connection of new interior partition wall to second floor structural frames. Detail shall be clearly cross-referenced onto the plan. 4th Review Comment: Detail connection of new metal studs wall to structural floor-ceiling was not provided. Please provide support for top of wall to floor-ceiling structural frames. Details shall be clearly cross-referenced onto the plan.Sheet S1: Special inspection – Please include special inspection required for field welding. 4th Review Comment: Plan was not revise. Please specify special inspection is required for field welding. Sheet 2: Foundation plan – Footing is required at each supporting columns. Please provide structural calculation and details.On the plan, please clearly show pad footing at each columns. Detail 3/S2 shall be clearly cross-referenced onto the plan. Detail 2/S2 still called out on the plan. 4th Review Comment: Plan was not revised. Please revise plan to show footing at each supporting column. Sheet S3: On the plan, please clearly identify location of moment frames for resisting lateral loads, on both directions. 4th Review Comment: Plan was not revised. Please comply. Provide calculation for footing supporting moment frames. Design connection and footing for uplift forces. 4th Review Comment: Plan was not revised. Please comply.(End of Comments)