Loading...
HomeMy WebLinkAbout304314_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115750 PROJECT ADDRESS: 1900 E Carnegie Ave Unit# A PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/12/2023 INITIAL REVIEW 7/16/2023 EXPIRATION 1/8/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jay O'Doherty 3. TEL: (951)736-8161 FAX: VALUATION: $250,000.00 EMAIL: jay@pettit-ea.com FLOOD ZONE: X-0602320279J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. PLAN REVIEW COMMENTS: Sheet A-2 Minimum 60” maneuvering clearances from existing electrical room to new equipment platform Existing utility room door was swing outward, maintain new door swing outward for the existing utility area Sheet 2 Provide structural framing for roll up door header size, posts and foundation at the northwest face Sheet 3 Provide structural framing for roll up door header size, posts and foundation at the southwest face Sheet S-1 Provide construction detail of how (N) thicken edge integrate with (E) slab Provide new equipment anchorage detail for the (N) chiller and pump. Indicate maximum operating weight on drawing Sheet SD-1 Detail G: Provide calculation and constriction detail for cooling tower and heat exchanger anchorage Indicate maximum platform height on plan Detail N: Provide bolt to plate edge distance in the short direction of the plate Detail K: Provide plate size and bolt spacing Detail T: EOR to provide calculation justification that 3/8” HSS tube wall is adequate to take the resultant loads from the diagonal brace Provide construction detail for metal stud opening details at louver and roll-up door(End of Comment)