HomeMy WebLinkAbout303231_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115437 PROJECT ADDRESS: 3535 W Garry Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/13/2023 INITIAL REVIEW 6/22/2023 EXPIRATION 12/10/2023 RECHECKS: 1.7/18/2023 PROJECT APPLICANT CONTACT PERSON: 2. Brad Kenson 3. TEL: (949)228-5687 FAX: VALUATION: $10,000.00 EMAIL: brad@fastrackpower.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100). DoneSheet S1.5: Detail 1: CO2 tank detail – Please specify maximum height and diameter of the tanks. Provide CO2 tank specification.Detail 2: RO tank detail On the plan, please clearly show location of the RO tank and include in the scope of work. Please show dimensions for RO tank, including height and diameter. Provide tank specificationProvide enlarged detail to show connection of cable to angel plate to concrete footing. Provide positive connection of cables to top of tank. Structural calculation for the proposed tanks were not provided. Please provide calculation for the followingCalculation for foundation supporting the tanksCalculation for anchor connection for overturning forcesCalculation for cablesDesign for full tank and empty tank conditions2nd Review Comment: Calculation was not provided. Only calculation for the fencing was provided. Please provide calculation for the items listed above. Specify special inspection is required for concrete strength, post-install anchor bolts. 2nd Review Comment: Please comply. Sheet S1.0 was not provided as responded. Sheet S2.4: Please show foundation dimensions. Provide detail between new pad and existing building footing. Show separation joist between new pad and existing structure wall/footing. 2nd Review Comment: Detail 13/S1.5 – Please revise detail to show separation joist between the new pad and existing structure wall/footing. (End of comment)