Loading...
HomeMy WebLinkAbout301389_2_Corrections.docxPLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101114859 PROJECT ADDRESS: 2102 S Flower St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/26/2023 INITIAL REVIEW 5/19/2023 EXPIRATION 10/23/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Richard Feileier 3. TEL: (949)770-2269 FAX: VALUATION: $1,064,445.00 EMAIL: rickf@r-melectrical.com FLOOD ZONE: X-0602320257J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Please provide the following on the cover sheet (first page)Scope of works, including number of light poles and pole’s heights. Applicable CodesProvide an overall site plan of the park and clearly show location of the proposed light poles. Reminder: Structural engineer stamp expiration date is 6-30-2023. Please update engineering stamp if it’s expired. Sheet S.1: Plan shall be stamped and signed by the structural engineer of record. Sheet S.1: Structural detail and information – Plan shall be legible. Provide details of light pole to precast structural base. Provide structural details of pole joint connection. Provide structural detail connection of lighting assemblies to light pole. Please submit foundation plan to the soil engineer for review and approval prior to submitting to City. (Soil report page 8)Soil report: Please update soil report to the current code edition (2022 CBC).(End of Comments)