HomeMy WebLinkAbout292813_4_Corrections.docxSPC
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101112042
PROJECT ADDRESS:
1951 E Dyer Rd Unit# D
PLAN CHECK ENGINEER:
Huang, GaryTEL:714
647-5862
EMAIL:
Ghuang@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
N/A
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/15/2022
INITIAL REVIEW
9/20/2022
EXPIRATION
3/14/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Joey Obanto
3.
TEL:
(909)441-1238
FAX:
VALUATION:$1,800.00
EMAIL:
Joey@americasinstantsigns.com
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer. CBC Sections A106.1 and A106.3.4.1.All drawings shall be signed by the person who prepared these plans and specifications.Include address and telephone number of the responsible designer, and date of signing of drawings.Please refer to red marks on the drawings for additional plan check comments. Revise drawings to show compliance.This review does not include mechanical, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.Provide the following information on plan Size of leg screw and embedment for the blade-sign to building wallNumber(s) of leg screwLeg screw spacing between each other Maximum weight of blade signCOMMENT NOT RESOLVE – information indicated on the plan-check comments list is not consider an official response, it shall be duplicated on the appropriate detail of the submitted plan. Please indicate information on plan. If the post-install anchor bolts are used, please specify type of post-install anchor, including manufacture, type of anchor bolts and minimum embedment per ICC ESR-Report