HomeMy WebLinkAbout302879_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115332 PROJECT ADDRESS: 2626 S Baker St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/6/2023 INITIAL REVIEW 7/24/2023 EXPIRATION 12/3/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Mike Abbas 3. TEL: (818)442-4455 FAX: VALUATION: $7,000.00 EMAIL: souria24@yahoo.com FLOOD ZONE: X-0602320259J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. PLAN REVIEW COMMENTS: Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck. ☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).☒Additional Review Comment: Sheet SP: Project summary: should the number of unit be 4 units? Sheet S General notes, Steel notes: update to 2022 CBC building code section Steel Stairways note D1: this exception is not valid. Delete note Specify which new grab rail is used at exact location. Detail 1A/S1 is install at top of stud wall where 1B/S1 is install at face of the wall. Specify only one detail. Sheet S1 Detail 2: Provide construction detail of HSS 1 ½”x 1 ½” connection to (E) stud wall at bottom cross member Provide constriction detail of HSS 1 ½” x 1 ½” connection to HSS 2x2 post at bottom cross member Detail 6: provide reference detail 4 for review Prior to submit the hard-copy drawings for approval and permit issuance. It is at applicant’s discretion, as an option, to submit a full-set electronic drawing (in pdf format) for a courtesy review. Please include the original red-marked comment drawing set, red-marked calculation, and all supporting document (revised calculation, etc.) for an expedite review. Red marked comment set is available to pick-up at the City Hall.(End of Comment)