Loading...
HomeMy WebLinkAbout303858_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115611 PROJECT ADDRESS: 101 S Harbor Blvd PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/27/2023 INITIAL REVIEW 7/2/2023 EXPIRATION 12/24/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kasey Clark 3. TEL: (951)471-8419 FAX: VALUATION:$12,400.00 EMAIL: info@akcservices.net FLOOD ZONE:X-0602320256J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. PLAN REVIEW COMMENTS: Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck. ☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Sheet DEV-COAS-00667-r7 (9 of 15): EOR to provide engineering stamp & signature on this sheet Top view: provide welding requirement at framing corner Section view: provide fastener schedule. EOR to verify/clarify that only one 3/8” lag bolt along the height of the unit? Provide additional connection as required Sheet DEV-COAS-00667-r7 (10 of 15) EOR to provide engineering stamp & signature on this sheet Framing section view: ENGR to provide connection of 4x4 plate to HSS 1 ½”x1 ½” tube Section view: provide welding of 4x4x1/8 aluminum angle welding to framing. Sheet COAS-CNPY-00011 (1 of 2) EOR to provide engineering stamp & signature on this sheet Sheet COAS-CNPY-00011 (2 of2) EOR to provide engineering stamp & signature on this sheet EOR to provide connection detail at each framing intersection typical. Red marked comment set is available to pick-up at the City Hall.(End of Comment)