HomeMy WebLinkAbout305257_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101116063
PROJECT ADDRESS:
4050 W Chandler Ave
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/2/2023
INITIAL REVIEW
8/8/2023
EXPIRATION
1/29/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Daniel Williamson
3.
TEL:
(951)850-1256
FAX:
VALUATION:
EMAIL:
daniel@r-cold.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)PLAN CHECK COMMENTS:Per City’ record, the changes on delta 7 through delta 9 are not part of the approved plans (only up to delta 6). Please include them into this permit scope of work.Sheet T-1. Please provide the narrative of the scope of work for this revision on plan. The extent of the scope shall include all delta 7 through delta 9 changes. Update door #3, door #8 through door #16.This submittal should include delta 7 and delta 8 in addition to delta 9. Cloud and show delta number on plan. Provide all affected sheets. Provide the latest door schedule and window schedule. Doors and windows are changed after the original plans were approved.Sheet ST-1.1. Exterior door #3. Show level area 60” in direction of door swing and 24”(exterior) jamb clearance on plan. (CBC 11B-404.2.5, 11B-404.2.4, Table 11B-404.2.4.1, 11B-404.2.10)Sheet IP-0. Provide door design and details for the door #3, door #8 through door #16.Sheet IP-0. The hallway and the existing restroom by the locker room is changed and a new door is provided, provide the door design and specifications on plan.
Per plan check item #12, provide accessible restroom signage and show compliance on plan:
Unisex toilet and bathing facilities shall be identified by a circle ¼” thick, 12” in diameter, with a ¼” thick triangle with a vertex pointing upward superimposed on the circle and within the 12” diameter. The triangle symbol shall contrast with the circle symbol, either light on a dark background or dark on a light background. The circle symbol shall contrast with the door, either light on a dark background or dark on a light background (CBC 11B-216.8.1,11B-703.7.2.6.3)Accessible restroom geometric symbol shall be mounted at 58-60 inches above the finished floor measured from the centerline of the symbol. (CBC 11B-703.7.2.6)Sheet IP-0. Door #9 shall be 45 minutes rated minimum.Sheet IP-0. Provide specification and label those windows at office #6 and office #10. Sheet IP-0.1. Provide tactile exit sign at the interior exit access door #16. The sign should be on the latch and egress side of the door.Sheet IP-0.1. Insufficient maneuvering clearance at the interior door #16 and new restroom door by the locker room. Show level area 60” in direction of door swing and 18”(interior) jamb clearance on plan. (CBC 11B-404.2.5, 11B-404.2.4, Table 11B-404.2.4.1, 11B-404.2.10).Sheet IP-1.0. Detail 3. Revise upper limit of the mounting height for wall-mounted tactile signage. Tactile characters on signs shall be located 60 inches maximum above the finish floor or ground surface, measured from the baseline of the highest line of raised characters. Refer to Figure 11B-703.4.1. (11B-703.4.1).Sheet IP-1.0. Provide missing fire assembly detail on the wall schedule item #2. Plan shows the detail is on detail 2 on sheet S-2.3. However, it is not available on both approved plans and this submittal.Please clarify and resubmit structural calculation. Submit the updated calculation pages only relevant to the extent of scope of delta 7 through delta 9.END OF COMMENTS