Loading...
HomeMy WebLinkAbout303231_4_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115437 PROJECT ADDRESS: 3535 W Garry Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/13/2023 INITIAL REVIEW 6/22/2023 EXPIRATION 12/10/2023 RECHECKS: 1.7/18/2023 PROJECT APPLICANT CONTACT PERSON: 2.8/1/2023 Brad Kenson 3. TEL: (949)228-5687 FAX: VALUATION: $10,000.00 EMAIL: brad@fastrackpower.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100). Done[8/1/2023] Sheet ST1.1:This permit application and plan review is only for the proposed CO2 tanks and its enclosure. The new sliding gate, the new parking layout and striping are not part of this plan review and permit application. Please revise site plan to remove all new gate and fencing, and show parking layout matching with the previous approved plans (PC# 101111863). Otherwise, new application with the revise scope of work and additional plan check fee and time are required. (End of comment)