HomeMy WebLinkAbout301893_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
104114999
PROJECT ADDRESS:
2851 S Pullman St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/16/2023
INITIAL REVIEW
5/28/2023
EXPIRATION
11/12/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
William Jordan
3.
TEL:
(951)830-8257
FAX:
VALUATION: $50,000.00
EMAIL:
jordan@aclrails.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2022 California Building Standards Code with local amendments.Sheet S-1: Indicate on plan if automatic sprinkler is equip within the buildingSheet S-4:Provide stapled CBC 2022 CH11B, Division 6 (total of 9 pages) on each of the submittal setProvide additional markup on the review comment set on the drawing, include the accessible bathroom requirement, grab bars, clearance and etc. Sheet S-5, wall #4: please verify if there are 2nd floor level above the bathroom? Provide connection to the roof framing Provide total wall heightSheet S-7: truncated dome shall be located at curb rampSheet S-8: Verify hatch area on sheet S-8. It doesn’t match with one shown on Sheet S-7