PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101116338
PROJECT ADDRESS:
201 3/4 E Sandpointe Ave Unit# WCC01
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/24/2023
INITIAL REVIEW
9/6/2023
EXPIRATION
2/20/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Clay Gallagher
3.
TEL:
(858)964-7430
FAX:
VALUATION: $40,000.00
EMAIL:
cgallagher@md7.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
An application for a permit for any proposed work shall be deemed to have abandoned / expired after 180 days of the date of filing, unless such application has been issued.
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)Sheet T-1.0: Code Compliance – Please update codes to the 2022 California codes edition. Sheet T-2.1: Governing Code – Please update code and design parameter to reflect with the 2022 California Building Code and Design Standards. Sheet A-3.2: For clarity, please specify the manufacturer’s name (Hilti) and ICC report number for the epoxy anchor, on the plan. (End of Comment)