HomeMy WebLinkAbout288951_4_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102110854 PROJECT ADDRESS: 2737 S Poplar St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/17/2022 INITIAL REVIEW 6/17/2022 EXPIRATION 12/14/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jorge Andrade 3. TEL: (714)345-7245 FAX: VALUATION: $10,000.00 EMAIL: ignacio.ochoa@gmail.com FLOOD ZONE: X-0602320259J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review. 6. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).NO COMMENTS HAVE BEEN ADDRESSED IN RESUBMITTAL. ADDRESS ALL COMMENTS PRIOR TO FURTHER RESUBMITTALS. DocumentationCity patio cover standard cannot be used to cover existing enclosed patio and open patio. Many variables do not match or meet criteria. Legalization of both will require city plan check items as noted in comments for review and approval. Or demo/revisions on plans to show any items not currently meeting standard that will be revised to meet standard (e.g. 12” max overhang will require demo of roof rafters) Provide a project description with a complete and detailed scope of work on the cover sheet of the plans. Provide the following design data on the first sheet (R106.1.1) ☒Sheet Index ☒Occupancy groups (R-3/U) ☒Type of construction (V-B) ☒Automatic Fire Sprinkler (YES or NO) ☒Number of stories. ☒Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☒Floor area per occupancy group, including the existing structure(s) ☒Construction shall comply with the 2019 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Provide details for existing framing, connections, foundation, walls, headers, etc.Provide calculations for both gravity and lateral elements for both patios.(End of Comment)