HomeMy WebLinkAbout304223_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115725 PROJECT ADDRESS: 3400 W Garry Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/10/2023 INITIAL REVIEW 8/15/2023 EXPIRATION 1/6/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Javier Cambero 3. TEL: (909)237-2219 FAX: VALUATION: $30,000.00 EMAIL: javier.cambero@nhmh.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Public Works Agency approval (647-5039)Second review cycle plan check comments:Sheet T1-0. Update the number of the total racks and indicate type of racks in the scope of work. By calculating the drawings, the revised plan shows (12) not (16) type A racks and (10) type A1 racks. Please clarify and show correct number in the scope of work. Clarify if type B and Type T are part of the scope. Provide number and dimensions in the scope of work.Provide engineering calculation, design and details for type A1 racks.Sheet A2-0. Row 19. Add note to plan: ”The egress route is not allowed to go through underside of the racks or equipment platform”.Sheet A2-0. Clarification. Clarifytype of racks over the tunnel area.Sheet A2-0. Clarification. Identify location of the type B and type T racks on plan.Load application and rack configuration drawings shall be furnished with each rack installation. The drawings shall present the permissible configurations or limitations as to the maximum number of shelves or rails, the maximum distance between them, and the maximum distance from the floor to the bottom shelf or rail.In the structural calculation book, please include all pages of calculation for rack type B and type T. If type B or type T racks are not part of scope, remove them from sheet SED.Sheet SED. Provide longitudinal and traverse elevation for rack type A and type A1. Clearly label each elevation on sheet SED.Lower portions of posts exposed to damage by forklift trucks or other moving equipment shall have protective devices. If not so protected, at the option of the building official, the rack structure may: (1) be designed to maintain its full design load capacity at allowable stresses with the exposed post capacity reduced by one-half or (2) be designed to maintain its full design load capacity at 50 percent increased allowable stresses with the exposed post assumed to have no carrying capacity.The engineer responded to provide post protection. Provide design and detail of the post protection on the drawing.END OF COMMENTS