HomeMy WebLinkAbout308989_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101117190 (unit A),101117260 (unit B) ,101117261(unit C)
PROJECT ADDRESS:
123 W Seventeenth St Unit# A, B and C
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/24/2023
INITIAL REVIEW
10/30/2023
EXPIRATION
4/21/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Vincent Tran
3.
TEL:
(714)719-4558
FAX:
VALUATION:
EMAIL:
vincentofcentralpacific@gmail.com
FLOOD ZONE: X-0602320163J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (714-647-5804.) Previously approved plans
should be submitted to expedite the process.Refer to redlines on plan. There are a few interior restroom elevations not matching the floor plans throughout (3) accessible restrooms. Please update the location of plumbing fixtures and interior room dimensions on the elevations to be consistent with the floor plan and complying with 2022 CBC ch 11B.(Information) Two new permit numbers are created for revisions to restrooms located on other tenant spaces: Unit B-101117260 and unit C-101117261. Therefore, this plan check includes revisions to (3) restrooms on the same submittal.END OF COMMENTS