Loading...
HomeMy WebLinkAbout304262_2_Corrections.docxPLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102115740 PROJECT ADDRESS: 1629 W Seventeenth St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/11/2023 INITIAL REVIEW 8/21/2023 EXPIRATION 1/7/2024 RECHECKS: 1.11/1/2023 PROJECT APPLICANT CONTACT PERSON: 2. Ibrahim Alsouqi 3. TEL: (714)716-7596 FAX: VALUATION: $10,000.00 EMAIL: isalsouqi@gmail.com FLOOD ZONE: X-0602320144J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840)Sheet A-1: Letter from owner: Please revise letter to acknowledge the following:This permit is for demolition only and not for occupancy. Landlord and tenant will coordinate to provide and address the exterior and interior accessibility requirement per Section 11B-202 under tenant improvement permit. The building shall not be occupied until a tenant improvement permit addressing all exterior and interior accessibility requirements per section 11B-202, is issued and final.2nd Review Comment: Letter was not provided. Please comply. A separate Mechanical, electrical and plumbing permit may be required for the demolition of existing mechanical, electrical and plumbing. 2nd Review Comment: Please obtain MEP permits prior to or at the same time of the building permit issuance.