HomeMy WebLinkAbout309073_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
104117221
PROJECT ADDRESS:
4044 W Garry Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/25/2023
INITIAL REVIEW
11/14/2023
EXPIRATION
4/22/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Brad Kenson
3.
TEL:
(949)228-5687
FAX:
VALUATION: $20,000.00
EMAIL:
brad@fastrackpower.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- School District Compliance Certificate; a copy of the building permit application, signed by the plan check
engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.An application for a permit for any proposed work shall be deemed to have abandoned / expired after 180 days of the date of filing, unless such application has been issued.Sheet TS-1: Sheet Index – Please note MEP are under separate review. Sheet a1.1: Interior wall panels – On the plan, please provide ICC/UL report number for the panelized wall system. Provide construction details to show connection of wall panel to structural members above and to slab below. Wall support shall be designed for out-of-plane load. Sheet a1.1: On the plan, please specify door schedule and door hardware.
Door hardware: Note on plan –
Egress doors/gates shall be readily openable from the egress side without the use of a key or special knowledge or effort. (1010.1.9)
Openable parts of such hardware shall be 34 inches minimum and 44 inches maximum above the finish floor or ground.
The force for pushing or pulling open a door shall be 5-lb maximum.
Operable parts shall be operable with one hand and shall not require tight grasping, pinching, or twisting of the wrist. Sink and counter – Please provide counter top elevation. Sink and counter top shall be accessible to the persons with disabilities. Structural calculation: Please revise calculation to show reflect with the 2022 CBC and current Design Standards. (End of Comment)