HomeMy WebLinkAbout302368_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
102115169
PROJECT ADDRESS:
1244 S Parton St
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/22/2023
INITIAL REVIEW
6/30/2023
EXPIRATION
11/18/2023
RECHECKS:
1.9/18/2023
PROJECT APPLICANT CONTACT PERSON:
2.12/14/2023
Ernie Benavides
3.
TEL:
(951)377-3625
FAX:
VALUATION: $25,000.00
EMAIL:
ernie@soleilarchitecturegroup.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance(CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☐Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationProvide stamped and signed calculations for new patio cover attached to garage.DrawingsSheet A01All items to be addressed for code enforcement issues must be provided in clear description in scope of work and presented in drawings. This includes the water heater relocation and washer dryer relocation.Verify if Tuff Shed is the existing shed reviewed by code enforcement or if existing is being replaced with new Tuff Shed. Provide manufacturer specs for Tuff Shed in drawings.PC #2: Comment not addressed. Provide manufacturer specs/design for Tuff Shed in drawing set or in separate package. Pre-manufactured storage specs should be stamped and signed by manufacturer engineer.PC #3: Unpermitted shed not pre-manufactured as noted shall be accompanied by engineering for gravity and lateral design. Adequate lateral resistance shall be designed and noted on plans.Verify if setbacks to property lines are to building wall or end of roof projections. Roof projections within 5’-0” from property line requires 1-hour fire rated underside or code approved alternative. No roof projection permitted within 2’-0” of property line. Specify on plan where required and provide detail of proposed system. Sheet A02Detail 4/A4 referenced at side of patio cover does not provide ceiling joist connection. Provide detail for ceiling joist connection. Provide framing and connection information for vertical and diagonal web members shown in section view. Sheet A03Provide connection detail at ends of new 4x12 beam. Provide California framing detail at top and valleys. Sheet A04Detail 1 – Provide post installed condition at existing slab on grade. Else provide new slab on grade per detail.Additional CommentsSheet A02Patio framing does not match new structural sheets. Coordinate with structural and revise as needed.Sheet A03Patio framing does not match new structural sheets. Coordinate with structural and revise as needed.Sheet S-1Fix text interference on EOR stamp. Typical all structural sheets.(End of Comment)