HomeMy WebLinkAbout309421_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101117338-39
PROJECT ADDRESS:
849 E McFadden Ave Unit# 2
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/3/2023
INITIAL REVIEW
12/13/2023
EXPIRATION
5/1/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
David Nguyen
3.
TEL:
(510)650-5499
FAX:
VALUATION: $125,360.00
EMAIL:
httr.3g@gmail.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- School District Compliance Certificate; and a copy of the school fee worksheet, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.Development fee:For the purpose of Park & Rec Development fee calculation, please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet. Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.
Development fee:Note on plan: The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”.
Note on the cover sheet: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.
Add note on the first sheet that “Solar permit issuance is required prior to perform framing inspection”.
Provide the following on address number for detached ADU:
Show the location of the address number on the site plan. The address number shall be legible and placed in a position that is visible from the street or road fronting the property.
The address number shall be Arabic numbers or alphabetical letters.
Numbers shall not be spelled out.
Each character shall be not less than 4 inches in height with a stroke width of not less than 0.5 inches.
END OF COMMENTS