Loading...
HomeMy WebLinkAbout307755_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101116799 PROJECT ADDRESS: 4313 W Morningside Ave Unit# 2 PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/22/2023 INITIAL REVIEW 11/6/2023 EXPIRATION 3/20/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Tom Vo 3. TEL: (714)299-4770 FAX: VALUATION: $150,000.00 EMAIL: adusb9@gmail.com FLOOD ZONE: A-0602320143J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. PLAN REVIEW COMMENTS: Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck. ☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). ☒2. This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A or AE. This zone requires that the lowest finish floor elevation (including basement) of the structure shall be at (or above) base flood elevation determined by a hydrology study for the A zone, or at (or above) the base flood elevation specified for the AE zone, on the flood insurance rate map. All elevations must be referenced to the National Geodetic Vertical Datum. Reference should be made to the Flood Plain Management Ordinance, Santa Ana Municipal Code, Chapter 7, for complete requirements. Drawings shall show compliance with said ordinance including noting flood zone and finish floor elevation." ☒3. Note on plans: "A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a FINAL CERTIFICATE must be submitted at the time of final inspection." ☒4. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection. ☒5. Add note on the coversheet: Minimum __1.98__(KW) photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request. ☒6. Exterior walls without Automatic Residential Fire Sprinkler – (Table R302.1(1)) Exterior walls located less than 5-ft from a property line shall be of one hour construction. Exterior walls located less than 3-ft from a property line – No opening shall be provided. Wall between 3-ft and 5-ft of the property line – 25% of wall openings are permitted. Eaves projection – Provide one-hour protection on the underside of eave when eaves projected into the 5-ft of fire separation distance. No projection beyond 2-ft of the fire separation distance. ☒7. Show/provide safety glass in hazardous locations (R308) – ☐Glazing in doors – all fixed and operable panels of swinging, sliding and bifold doors. ☐Glazing within 24” of door and those bottom edge is less than 60”. ☐Glazing with exposed area more than 9 sq. ft with bottom edge is located less than 18” above the walking surface and top edge is located more than 36” above the floor. ☒Glazing in enclosure for or walls facing hot tubs, bathtubs, showers, whirl-pools, saunas, steam rooms where the bottom edge of the glazing is less than 60” above the any standing surface. ☐Glazing in railings ☐Glazing adjacent to stairways, landings and ramps with 36” horizontal of a walking surface and bottom edge located less than 60” above the floor. ☐Site built windows shall comply with Section 2404 CBC. Energy Conservation – Title 24 Energy forms & calculations ☒1. Kitchen shall be vented to the outside. On the plan, please show exhaust fan(s) in kitchen (100 cfm minimum). ☒2. New building, or addition more than 1000 sq.ft. – Provide Whole house ventilation. On the plan, please provide/show method of whole house ventilation in compliance with ASHRAE Standard 62.2. – provide complete notes, details and calculations. (150.0(o)); (150.2(a)(C)) ☒3. On the plan, please specify U-factor (0.3 min) and SHGC (0.23 min) for building fenestration, per Title 24 calculation. ☒Additional Review Comment: For the purpose of Park & Rec Development fee calculation, please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.  Note on plan: The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”. Sheet A-01 Reference one hour rated wall and underside of eave rated details where within 5’-0” from property line Provide on plan per FEMA Elevation Certificate Top of bottom floor elevation Lowest adjacent grade Highest adjacent grade Sheet A-10 Update FEMA Elevation Certificate for 2023 Edition Page 1: Base flood elevation shall be established by either hydrology report or from LOMA report Page 2: Elevation certificate shall be complete by California Licensed Surveyor or Registered Civil Engineer Sheet A-11: Missing page 5 of soil report. Please incorporate into construction document Sheet S1: Provide calculation for diaphragm design Provide roof diaphragm nailing pattern and spacing per calculation Provide chord and drag design and indicate the required connection on plan 5” thick slab is required per soil report Provide detail connection of how 2x6 R.R connection to supporting element at the cover patio For 3.25’ long shear wall: Special inspection required for lateral revisiting element with nailing less than 4”o.c. (CBC 1705.13.2). List all other inspection required For shear wall aspect ratio greater than 2:1 required to multiply aspect ratio factor to nominal shear capacity (SDPWS 4.3.3.2) Prior to submit the hard-copy drawings for approval and permit issuance. It is at applicant’s discretion, as an option, to submit a full-set electronic drawing (in pdf format) for a courtesy review. Please include the original red-marked comment drawing set, red-marked calculation, and all supporting document (revised calculation, etc.) for an expedite review. Red marked comment set is available to pick-up at the City Hall.(End of Comment)