Loading...
HomeMy WebLinkAbout311512_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101117953 PROJECT ADDRESS: 825 N Parkcenter Dr Unit# 200 PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/11/2024 INITIAL REVIEW 1/18/2024 EXPIRATION 7/9/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Amanda Humphrey 3. TEL: (949)660-9128 FAX: VALUATION: EMAIL: FLOOD ZONE: X-0602320164J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Detail 1 / S202: Please provide the following information – Provide detail to show attachment (fasteners) of glass panel to structural header. Provide detail to show attachment (fasteners) of bottom of glass panel to structural floor members. (End of Comment)