HomeMy WebLinkAbout311512_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101117953
PROJECT ADDRESS:
825 N Parkcenter Dr Unit# 200
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/11/2024
INITIAL REVIEW
1/18/2024
EXPIRATION
7/9/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Amanda Humphrey
3.
TEL:
(949)660-9128
FAX:
VALUATION:
EMAIL:
FLOOD ZONE: X-0602320164J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.Detail 1 / S202: Please provide the following information – Provide detail to show attachment (fasteners) of glass panel to structural header. Provide detail to show attachment (fasteners) of bottom of glass panel to structural floor members. (End of Comment)