Loading...
HomeMy WebLinkAbout311637_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101117983 PROJECT ADDRESS: 1444 S Main St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/16/2024 INITIAL REVIEW 2/6/2024 EXPIRATION 7/14/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Dave Cuevas 3. TEL: (714)215-4542 FAX: VALUATION: EMAIL: dave.cuevas@daccontractor.com FLOOD ZONE: X-0602320276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)Structural foundation and floor framing design needs to be updated due to reconfiguration of the interior wall locations. Please submit foundation and framing plans as part of thE revision submittals.END OF COMMENTS