Loading...
HomeMy WebLinkAbout308787_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101117140 PROJECT ADDRESS: 2301 S Main St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/AIIIB OCCUPANCY CLASSIFICATION(S): N/A B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/18/2023 INITIAL REVIEW 10/25/2023 EXPIRATION 4/15/2024 RECHECKS: 1.1/18/24 PROJECT APPLICANT CONTACT PERSON: 2. Mesfin Samuel 3. TEL: (214)922-8012 FAX: VALUATION: $550,000.00 EMAIL: msamuel@samuelgroup.net FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application:Please add on the first sheet, Light poles are not part o f this permit. ( Deferred Submittal) - Revise project job description on the building permit application worksheet to reflect the work to be done under the subject building permit application. ( including light standards, canopy over the ATM machines) - Construction drawings must clearly show all work to be done under the subject building permit application.CBC Sections A106.1 , All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.Ok 1/18/24This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) (light standard) - Public Works Agency approval (647-5039) Please see WQMP handout - Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following:Pending 1/18/24 - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. Provide 36” clearance between the truncated domes on sheet AS04. Enlarge path of travel from parking to the building to show complies with accessibility (to include slope, dimension,…)Pending 1/18/24 Provide 36” wide clear between truncated domes. Provide complete dimension for all accessible parking on sheet AS02. Pending 1/18/24, provide detail for access aisle.Show entrance of the building.Ok 1/28/24Provide detail for new side walk on sheet AS02.Ok 1/18/24Elevation 2/ AS03 shows roof top unit relocated, please apply for separate permit and provide complete roof plan and complete engineering and calculation for new roof top unit.Pending 1/18/24 show size of the opening due to removal of the units for the big opening show detail to fill it. Striping plan on sheet C.07 does not match As02. FYIOk 1/18/24Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B-202.4Ok 1/18/24 - Parking, signage and alarmsProvide parking space identification in accordance with CBC Section 11B-216.5.2 including:Ok 1/18/24 - Each parking space reserved for persons with physical disabilities shall be identified by a reflecting sign permanently posted immediately adjacent to and visible from each stall or space, consisting of a profile view of a wheelchair with occupant in white on dark blue background. The sign shall not be smaller than 70 square inches in area and, when in path of travel, shall be posted at a minimum height of 80” from the bottom of the sign to the parking space finished grade and shall be un-obscured by a parked vehicle. Signs may also be centered on the wall at the interior end of the parking space. An additional sign or additional language below the symbol of accessibility shall state “Minimum Fine $250.” - An additional sign shall also be posted in a conspicuous place at each entrance to off-street parking facilities, or immediately adjacent to and visible from each stall or space. The sign shall not be less than 17” by 22” in size with lettering not less than 1” in height, with clearly and conspicuously states the following:Unauthorized vehicles parked in designated accessible spaces not displaying distinguishing placards or license plates issued for persons with disabilities may be towed away at owner’s expense. Towed vehicles may be reclaimed by telephoning the Santa Ana Police Department at (714) 245-8665. CVC 22658a. - Provide assurance on the drawings that existing signage language reflects the paragraph above.Provide dimension for truncated dome and spacing between truncated domes on sheet AS02, to comply with parallel curb ramp CBC 11B-406.3. Pending 1/18/24 min 36” is required.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - Canopy over the ATM (sheet 7/As05) Add Deferred submittalShow spacing between 2 anchors on sheet 1/SD1, per calculation.Pending 1/18/24, please remove detail since it is not part of this permit. Provide complete dimension for the ATM machine on the calculation and the drawings.Ok 1/18/24Detail 2-SP 03, referenced on sheet AS02 is not included. Pending 1/18/24, still doesn’t apply please provide detail to show compliance with accessibility.Building is type IIIB construction, provide detail how the windows in the wall will be filled in. Please add to the first page , Light Poles, ATM machines and canopies are not part of this permit and will be differed submittal.