Loading...
HomeMy WebLinkAbout308302_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101117005 PROJECT ADDRESS: 3600 W McFadden Ave PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I-B, SPK OCCUPANCY CLASSIFICATION(S): M, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/5/2023 INITIAL REVIEW 10/21/2023 EXPIRATION 4/2/2024 RECHECKS: 1.1/27/24 PROJECT APPLICANT CONTACT PERSON: 2. Teresa Jones 3. TEL: (913)236-3371 FAX: VALUATION: $10,000.00 EMAIL: teresa.jones@brrarch.com FLOOD ZONE: X-0602320256J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDrawings must be to scale and be on 18” x 24” minimum sheets. - Scale of Drawings must be large enough to ensure legibility - Provide a fully dimensioned Floor Plan Clearly show the floor plan of the altered area.Ok 1/29/24Is new door inside the building or outside.Ok 1/29/24Provide the following:Pending 1/27/24, Clearly show curb ramp, truncated dome, slope, width,… comply with accessibility. - Disabled access compliance must clearly be shown on the site plan. (Enlarge path of travel to the new door)EXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1016.Ok 1/29/24 Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”Ok 1/29/24For power operated sliding door, please show compliance with section 1010.3.2 and 10110.3.3Pending 1/27/24, Not found.Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Ok 1/29/24Tactile exit signs shall be required at the following locations:Pending 1/27/24, show exit door from this area. - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”- Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B-247.1.2.5Pending 1/27/24, please show on the site plan.Provide dimension between the posts on detail 2/ A-1.Ok 1/29/24Provide dimension for foundation detail 1/S-1.Show the edge distance for the anchor bolts to the edge of the footing on sheet S-1. Pending 1/27/24Please identify type of the walls, is it screen?.Ok 1/29/24 Is there any wall or ceiling over the new door.Ok 1/29/24Provide full height section from bottom to the top of the building on detail 4/S-1.Ok 1/29/24 Provide complete cross section for the new door and the new canopy.Ok 1/29/24Identify lateral resistance system, justify the connection at the bottom. Justify the foundation.Pending 1/27/24, no calculation providedPlease remove electrical plans from architectural set.Ok 1/29/24