HomeMy WebLinkAbout312167_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102118157 PROJECT ADDRESS: 913 N Alene Cir PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/31/2024 INITIAL REVIEW 3/5/2024 EXPIRATION 7/29/2024 RECHECKS: 1.4/15/24 PROJECT APPLICANT CONTACT PERSON: 2. Catie Vuong 3. TEL: (714)260-4994 FAX: VALUATION: $70,000.00 EMAIL: catievuong@gmail.com FLOOD ZONE: A-0602320143J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. An application for a permit for any proposed work shall be deemed to have abandoned / expired after 180 days of the date of filing, unless such application has been issued. Sheet CV1.0: Deferred Submittals: Solar system is not required for this project. Please omit/delete deferred notes if Solar system is not provided. Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation. Sheet A1.0: Reminder:Additional plan check fee is required for the interior remodel. Please show location of clothes washer and dryer hookup. 2nd Review Comment: Washer and dryer shall not be located outside. Please coordinate and revise plan accordingly. If new laundry room is proposed, please contact Planning Division for review and approval prior to submit to Building Safety. Sheet A1.1: Provide/show an exhaust fan in bathroom adjacent to the office. 2nd Review Comment: Please comply. Sheet S-1: Roof rafters: Please use 2x10 roof rafters so that it would have the same depth with the hip beams, at the exterior bearing wall. 2nd Review Comment: Plan was not revised. Please revise plan to provide 2x10 roof rafters. Detail 10/SD-1: the 2” diameter vent holes are not allowed where fire-blocking is required (at wall line 1, south elevation). 2nd Review Comment: Detail was not revised. The fire-blocking is required at grid wall line 1. Detail 10/SD-1 showed eave vent holes is not allow along gridline 1.