Loading...
HomeMy WebLinkAbout314570_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101118899 PROJECT ADDRESS: 3201 S Halladay St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/15/2024 REVISION TO PC# 101113395 INITIAL REVIEW 4/17/2024 EXPIRATION 10/12/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. David R Gamboa 3. TEL: (714)597-5560 FAX: VALUATION: EMAIL: aes.dave67@gmail.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Please provide the approved plan under PC# 1011113395on the resubmittal.Please verify Best Pool Service LLC is still the business of this building. Otherwise, revise Project Data and Business information accordingly. Sheet A3: Please provide a separate cleanFirst Floor Plan for the new floor from the demo plan. Specify the use of each space. Sheet A3: Corridor / Hallway between stairway and storage room RM-01 is required to remain. Sheet A4: Please provide a separate clean Second Floor Plan for the new floor from the domo plan. Specify he use of each space. Sheet A4: Provide opening between the two storage areas for giving access to both stairways. Remove new wall or provide a corridor connection the two stairways. Sheet A4: Elevated IT Room: Please relocate I.T room to an area that at the same level with the rest of floor. **Plan was incomplete. Plan review will continue at time of resubmittal. Please include the approved plan on the next resubmittal **