HomeMy WebLinkAbout311922_4_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101118079
PROJECT ADDRESS:
4012 W Garry Ave
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
N/A
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/25/2024
Clearly indicate the scope of work under this permit application.Pending 3/28/24
INITIAL REVIEW
1/28/2024
EXPIRATION
7/23/2024
RECHECKS:
1.3/13/24
PROJECT APPLICANT CONTACT PERSON:
2.3/28/24
Brad Kenson
3.
TEL:
(949)228-5687
FAX:
VALUATION: $50000
EMAIL:
brad@fastrackpower.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2022 California Building Standards Code with local amendments.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100) ( to include relocation of 2 fire hydrants)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Orange County Sanitation District (714) 593-5756
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Pending 3/13/24Pending 3/28/24Indicate detail and section references as to their appropriate location on plan view. Ok 3/13/24Provide the following:Ok 3/13/24
- Provide a fully dimensioned site plan on each set of plans.
- Disabled access compliance must be shown on the site plan.
- Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables
601, 602, and 704.8.Show location of detail 25/ ST1.1, on the site plan. Pending 3/13/24, Demo plan that provided first time is missing. Please provide on the resubmittal set.Pending 3/28/24Enlarge each site plan to show complete exit access and exit to the public way.Ok 3/13/24CBC Sections 1002 and 1024, EXIT DISCHARGE. That portion of a means of egress system between the termination of an exit and a public way.Ok 3/13/24CBC Sections 1024.6 and 1018.1. Exiting from any occupied point in a building or structure on the subject site must be continuous, unobstructed, and undiminished to a public way. This includes gates which must show compliance with CDB Section 1008.2. Revise drawings to show compliance.Ok 3/13/24Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B:
- An accessible entranceOk 3/13/24
- An accessible route to the altered areaPending 3/13/24, please see comment #19.
- Parking, signage and alarmsOk 3/13/24If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5.Ok 3/13/24Complete the attached Disabled Accessibility Documentation Form.Pending 3/13/24 Form needs to be signed.Pending 3/28/24-Provide detail on the drawings for following items per Disabled compliance form;-landingPending 3/28/24 Not clear, everything shows as existing, what is new per hardship form?-Path of travelPending 3/28/24-Other Please identify others. 3/28/24 20. Please clearly indicate the scope of work. Please see page 1 of this checklist.