Loading...
HomeMy WebLinkAbout316257_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102119440 PROJECT ADDRESS: 1611 N Broadway PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/31/2024 INITIAL REVIEW 7/11/2024 EXPIRATION 11/27/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kevin Arambula 3. TEL: (562)293-5400 FAX: VALUATION: $50,000.00 EMAIL: kevin@phenarch.com FLOOD ZONE: X-0602320163J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). Sheet A1, Project Information: Currently the existing use of the building is as boarding house / care facility – On the plan, please specify business operation. Is this transient or non-transient boarding house? Please describe the caring business operation, including what kind of caring service is provided. Occupancy group (R-3) appeared not applicable to the permitted use of the building. Please coordinate and revise occupancy group in accordance with Chapter 3. Sheet A1: Project Statistic – The basement floor is a nonhabitable / non-living space. Please revise information to specify existing non-habitable space (mechanical storage space). Sheet A2: Exterior stairway - Please revise first floor plan to show stair go “UP”; not “DN”. Sheet A2: Replaced Windows at the main building shall meet energy efficiency in accordance with the California Energy Code. Please specify U-factor and SHGC for the replaced windows. Replaced windows in garage do not need to comply with Energy Code. (End of Comment)