Loading...
HomeMy WebLinkAbout315499_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101119191 PROJECT ADDRESS: 2010 E Warner Ave PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/13/2024 INITIAL REVIEW 5/16/2024 EXPIRATION 11/9/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Heidi Hare 3. TEL: (949)246-0492 FAX: VALUATION: $45,000.00 EMAIL: heidi@jlhare.com FLOOD ZONE: X-0602320279J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Applicant must pick up red marked sheet from the City prior to resubmittal and return the marked up set with resubmittal PLAN REVIEW COMMENTS: Sheet ROW-A-2.0-C2: Note 3: SEOR to specify welded connection for alum square to mounting plate Sheet ROW-A-3.1-C3: Note 1: provide welded connection for alum square to mounting plate Note 2: provide engineering design justification and detail anchor to wall is adequate Provide structural calculation and connection detail for alum square to (E) 2x3 outrigger Sheet ROW-A-21.0-D1: Provide positive connection for letters within the canopy channel web. Silicone Adhesive is not a positive connection. Sheet ROW-A-22.0-D2 Specify numbers of connection required to sheet channel canopy flange Sheet “The ROW AT RED HILL SIGN TYPE – C1” SEOR to verify should the moment arm in the design summary be 2” for sign to (E) canopy for the worst case Specify connector required and indicate spacing for channel letters to raceway. Sheet “The ROW AT RED HILL SIGN TYPE – C2” Specify welding required for ½” thk shim to alum outriggers and steel outrigger. Is the shim plate a continuous plate? Specify on plan if shim plate in continuous plate or in multiple pieces. Sheet “The ROW AT RED HILL SIGN TYPE – D1” SEOR to verify should the moment arm in the design summary be 2” for sign to (E) canopy for the worst case Specify connector required and indicate spacing for channel letters to raceway. Red marked comment set is available to pick-up at the City Hall.(End of Comment)