HomeMy WebLinkAbout316912_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101119648 PROJECT ADDRESS: 616 S Van Ness Ave Unit# C PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/18/2024 INITIAL REVIEW 7/9/2024 EXPIRATION 12/15/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Siamak Siyami 3. TEL: (949)632-9151 FAX: VALUATION: $100,000.00 EMAIL: siyami@gmail.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A0.1 Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection. Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet for each individual ADU.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”. Add note on the coversheet: Minimum ____ kWdcPhotovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request. For Solar Exemption, applicant must provide calculated kWh required and 2022 CEnC exemption on plans justifying exemption.THIS IS NOT A NOTESheet A0.3Provide T24 Conformance for each individual address.Sheet A1.1Specify Roof Shingle ICC ESR # on Roof Plan.Specify proposed # of vents and actual size to ensure required is met.Sheet A2.0Specify Wall Types on plan at all walls. Where floor assemblies are required to be fire-resistance rated, the supporting construction of such assemblies shall have an equal or greater fire-resistance rating. [R302.3.1]The following “Aging-in-place Requirements” shall be noted on plans (R327): Reinforcement for grab bar installation for bathrooms shall be provided. (R327.1.1) At least one bathroom on the entry level shall be provided with reinforcement installed. If there is no bathroom on the entry level, at least one on the second or third floor of the dwelling shall comply. Reinforcement shall be solid lumber or other construction materials approved by the enforcing agency. Reinforcement shall not be less than 2 by 8 inch nominal lumber or other construction material providing equal height and load capacity. Reinforcement shall be located between 32 inches and 39¼ inches above finished floor flush with the wall framing. Water closet reinforcement shall be installed on both side walls of the fixture, or one side wall and the back wall. Shower reinforcement shall be continuous where wall framing is provided. Bathtub and combination bathtub/shower reinforcement shall be continuous on each end of the bathtub and the back wall. Additionally, back wall reinforcement for a lower grab bar shall be provided with the bottom edge located no more than 6 inches above the bathtub rim. Electrical receptacle outlets, switches and controls intended to be used by occupants shall be located no more than 48 inches measured from the top of the outlet box and not less than 15 inches measured from the bottom of the outlet box above the finish floor unless exception met. (R327.1.2) Interior door width (at least one bedroom door and one bathroom door with 32” clear opening), effective July 1, 2024 (R327.1.3) Doorbell buttons or controls, when installed, shall not exceed 48 inches above exterior floor or landing, measured from the top of the doorbell button assembly. Where doorbell height requirement cannot be met for integrated doorbell features, a standard doorbell button or control shall also be provided at a height not exceeding 48 inches above exterior floor or landing, measured from the top of the doorbell button or control. (R327.1.4)Sheet A2.1Specify Wall Types on plan at all walls.The following “Aging-in-place Requirements” shall be noted on plans (R327): Reinforcement for grab bar installation for bathrooms shall be provided. (R327.1.1) At least one bathroom on the entry level shall be provided with reinforcement installed. If there is no bathroom on the entry level, at least one on the second or third floor of the dwelling shall comply. Reinforcement shall be solid lumber or other construction materials approved by the enforcing agency. Reinforcement shall not be less than 2 by 8 inch nominal lumber or other construction material providing equal height and load capacity. Reinforcement shall be located between 32 inches and 39¼ inches above finished floor flush with the wall framing. Water closet reinforcement shall be installed on both side walls of the fixture, or one side wall and the back wall. Shower reinforcement shall be continuous where wall framing is provided. Bathtub and combination bathtub/shower reinforcement shall be continuous on each end of the bathtub and the back wall. Additionally, back wall reinforcement for a lower grab bar shall be provided with the bottom edge located no more than 6 inches above the bathtub rim. Electrical receptacle outlets, switches and controls intended to be used by occupants shall be located no more than 48 inches measured from the top of the outlet box and not less than 15 inches measured from the bottom of the outlet box above the finish floor unless exception met. (R327.1.2) Interior door width (at least one bedroom door and one bathroom door with 32” clear opening), effective July 1, 2024 (R327.1.3) Doorbell buttons or controls, when installed, shall not exceed 48 inches above exterior floor or landing, measured from the top of the doorbell button assembly. Where doorbell height requirement cannot be met for integrated doorbell features, a standard doorbell button or control shall also be provided at a height not exceeding 48 inches above exterior floor or landing, measured from the top of the doorbell button or control. (R327.1.4)Sheet A2.3Revise Kitchen Exhaust Hood Note to meet current 2022 California Energy Code. The following Electric Ready notes shall be added and constructed for new detached residential structures: Water Heating system (water heater) – (Section 150.0(n)) Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n). If the designated space is within 3 feet from the water heater: A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater. ii. Isolate both ends of the unused conductor. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker A condensate drain that allows natural draining of the water heater. . If the designated space is more than 3 feet from the water heater: see additional Code requirements. When a second water heater is installed as part of the addition shall comply with Section (150.2(a)(D). Energy Storage System (ESS) Ready: All single-family residences that include one or two dwelling units, and ADU shall meet the following: At least one of the following shall be provided: ESS ready interconnection equipment [auto transfer switch and panel] with a minimum backed-up capacity of 60 amps and a minimum of four ESS-supplied branch circuits, or A dedicated, minimum 1” raceway from the main service to a subpanel that supplies the branch circuits in Section 150.0(s)(2). A minimum of four branch circuits shall be supplied by the ESS: the refrigerator, one lighting circuit shall be located near the primary egress, and at least one circuit shall supply a sleeping room receptacle outlet. The main panelboard shall have a minimum busbar rating of 225 amperes with space to install future isolation equipment/transfer switch within 3 feet. Heat pump space heater (furnace) ready: System using gas furnace to serve individual dwelling units shall include a dedicated 240 volt, minimum 30 amps branch circuit wiring shall be installed within 3-ft from the furnace for a future heat pump space heater installation. Electric cooktop ready: System using gas to serve individual dwelling units shall include a dedicated 240 volt, minimum 50 amps circuit wiring shall be installed within 3-ft from the cooktop for a future electric cooktop installation. Electric clothes dryer ready: Clothes dryer using gas to serve individual dwelling units shall include a dedicated 240 volt, minimum 30 amps branch circuit wiring shall be installed 3-ft from the clothes dryer location for a future electric clothes dryer installation.Sheet A3.2 Under-stair protection: Provide ½-inch gypsum board on walls, under-stair surface and soffit on the enclosed side. (R302.7)Sheet A4.0Verify 24” clear height provided for egress windows while fully open. Single hung window type does not look to meet requirement when fully opened. Sheet A5.0Detail 1 – Coordinate Gyp Board called out with wall legend provided on plans for interior wall. Gyp does not match.Detail 1 – Verify 2x4 wood stud spacing specified on detail with plan.Detail 11 – Fix FELT UNDERLAYMENT (SHIP LAP) note found between Detail 11 and 7Sheet G1.0Verify drainage direction at front and rear side of ADU. Drainage is directed towards adjacent buildings. Sheet S-1.0Revise Title Block to match architectural sheets. Address and Title does not match. Revise Foundation note to reference Soils Report. Include company, report number, report date, any information taken from report, and any required review prior to approval and during construction. Geotechnical engineer shall review and approve drawings as needed prior to approval. Sheet S-2.1Provide dimensions to 2-2x girders. Typ all locations.Justify drag/chord for lateral transfer around diaphragm opening at stairs. Ensure adequate drag to all shear walls.Provide calculations and details for stairs and landing. Provide landing framing information.Provide framing at area north of stair area.Provide detail for floor joist load bearing connection/splice at interior load bearing walls.Provide detail for non-load bearing wall top and bottom connection. Ensure complete non-load bearing is provided. Sheet S-2.2Justify drag/chord for lateral transfer around diaphragm opening at stairs. Ensure adequate drag to all shear walls.Provide Roof rafter information at California Framing.Specify CJ size and direction on plan.Provide detail for non-load bearing wall top and bottom connection. Ensure complete non-load bearing is provided. CalculationsBeam RB-01 – Verify California framing post support loading is applied to beam design.Seismic Analysis – justify stair loading and mass transfer in structure. Shear Wall Design – Verify how floor mass is transferred to shear wall along Line A at Level 1. Shear wall along Line A is a full height unbraced wall. Justify aspect ratio and design with any factor required. Provide calculation and detailing for guard rail system.(End of Comment)