Loading...
HomeMy WebLinkAbout307087_4_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101116571 PROJECT ADDRESS: 637 E Adams St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/7/2023 INITIAL REVIEW 9/28/2023 EXPIRATION 3/5/2024 RECHECKS: 1.10/30/23 PROJECT APPLICANT CONTACT PERSON: 2.2/21/24 Edwin Vazquez 3. TEL: (714)422-4647 FAX: VALUATION: $22,000.00 EMAIL: vazedwin1@gmail.com FLOOD ZONE: X-0602320278J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).Ok 10/30/23Walls of dwelling units and accessory buildings without an automatic residential fire sprinkler protection with a fire separation distance less than 5 feet are required to have a full one hour rating. Ok 10/30/23Openings are not permitted less than 5 feet to the property line. Ok 10/30/23 Submit engineering calculations for lateral loads prepared by a registered Civil, Structural Engineer or Architect. Additional Structural Corrections may apply.Pending 10/30/23 Please note, this is not a complete plan review, since the drawings are not complying with CBC 2022, additional plancheck comments might be given at the time of resubmittal. 10/30/23 On framing plan, change ceiling joists to 2x8, roof rafters to 2x6 and beams to 6x12 per calculation. Provide 6x posts for 6x12 beams. Ok 2/21/24 Show minimum 6’-8” headroom on the elevation under bracing.Ok 2/21/24 Show the height under the beam.Ok 2/21/24 Show 5:12 slope on the roof plan or elevation.Ok 2/21/24 2/21/24 Footing calculation from previous calculation ( sheet 9) is missing , perimeter footing is changed to pad footing. Beam #4, please provide 2 point loads from the bracing and the wind load. Provide hurricane tie or similar connector to resist the uplift (on the roof framing plan).