Loading...
HomeMy WebLinkAbout317322_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101119766 -70 PROJECT ADDRESS: 1810 E First St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V A, SPK OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/3/2024 INITIAL REVIEW 7/17/2024 EXPIRATION 12/30/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Angela Meyer 3. TEL: (949)296-2400 FAX: VALUATION: EMAIL: angela@brandywine-homes.com FLOOD ZONE: X-0602320277J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSheet A141, please cloud all revised area.Please cloud sheet AC312 section B to match the revision.Please call out detail 15/AD811 on the plan view and show where it does apply.Sheet A121, please cloud all revised areas.Sheet A121, for the opening on Tech Desk area showing a wall symbol please revise accordingly. Sheet A311 , referenced in the application is not included.Does removal of pantry wall apply to both plan 2A and 2B on the second floor? If it does revise plan 2A accordingly.Sheet AB- 216, please cloud only affected areas.Please note since this revision includes addition, separate permit is required for each unit and school district approval is required.SEOR to provide all structural drawings showing the removal of roof framing per architectural drawings (e.g. sheets AA-314, AB-315, and AC-312), typical to all units, and all buildingsSEOR to provide structural calculation justification showing that by removal of roof framing, the cantilever wall remained (5’-6” in height) is adequate. Provide adequate details and reference the details on plan, typical to all buildings and at all locationsSEOR to provide structural calculation justification for (E) floor beam (now it is the new roof framing) that it is adequate to take the deck load with additional live load, and roofing material. Sheet S2.2, identify the changes on plan to unit 240.