Loading...
HomeMy WebLinkAbout315772_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101119290 PROJECT ADDRESS: 1901 N Fairview St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): E PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/15/2024 INITIAL REVIEW 5/18/2024 EXPIRATION 11/11/2024 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Guillermo Acuna 3. TEL: (909)232-4679 FAX: VALUATION: $210,000.00 EMAIL: guillermo@budlong.com FLOOD ZONE: X-0602320144J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Applicant must pick up red marked sheet from the City prior to resubmittal and return the marked up set with resubmittal PLAN REVIEW COMMENTS: Sheet E1.01 Detail 2 Indicate (E) electrical room wall construction material. Is it metal stud wall or CMU wall? [Comment Resolved] Provide structural anchorage detail for the (N) electrical panel to (E) wall [Comment Resolved] Sheet E3.01 Provide structural specification including concrete, structural reinforcing strength, design code used & design criteria (CBC1603) [Comment Resolved] Detail 3 Provide structural foundation detail and calculation for the light pole for review [Comment NOT complete – see plan review comments date 6/13/2024] Red marked comment set is available to pick-up at the City Hall. PLAN REVIEW COMMENTS (6/13/2024): Sheet S1.0 Concrete strength required 4500 psi per calculation. SEOR to revise to match with calculation. Sheet S2.0 Pole footing ACI 318, section 10.7.6.1.5, required transverse reinforcing to be distribute within top 5” with either 2-#4 or 3-#3 ties ACI 318, section 25.7.2.4.1, required minimum 6” tie overlap Pad footing Enercalc calculation required pedestal 24” square x 12” height pedestal. SEOR to revise detail to match calculation Enercalc calculation required 10-#5 top and bottom each direction. SEOR to verify and match calculation (End of Comment)