HomeMy WebLinkAbout315025_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101119038
PROJECT ADDRESS:
1509 W Glenwood Pl Unit# 2
PLAN CHECK ENGINEER:
Huang, GaryTEL:714
647-5862
EMAIL:
Ghuang@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/25/2024
INITIAL REVIEW
4/27/2024
EXPIRATION
10/22/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Victor Rios
3.
TEL:
(714)788-9836
FAX:
VALUATION: $66,948.00
EMAIL:
vicrios9620@gmail.com
FLOOD ZONE: X-0602320257J
GUIDELINES:
Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies
This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES)
The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws
All listed plan review comments must be adequately addressed before a building permit can be issued
Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
PLAN REVIEW COMMENTS:
Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck.
☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☒Police Department approval on the corrected/final set of drawings (647-5840).
☒Public Works Agency approval (647-5039).
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).
☒2. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.
[Comment resolved]
☒3. Exterior walls without Automatic Residential Fire Sprinkler – (Table R302.1(1))
Exterior walls located less than 5-ft from a property line shall be of one hour construction.
Exterior walls located less than 3-ft from a property line – No opening shall be provided.
Wall between 3-ft and 5-ft of the property line – 25% of wall openings are permitted.
Eaves projection – Provide one-hour protection on the underside of eave when eaves projected into the 5-ft of fire separation distance. No projection beyond 2-ft of the fire separation distance.
[Comment not completely resolve – detail 7/4 required 5/8” type “x” drywall to extend to the bottom of roof sheathing to achieve 1 hour rated wall]
☒4. Clearly indicate on floor plan the location of existing walls, existing opening for the existing garage prior to the conversion.
[Comment resolved]
☒5. Walls separating dwelling units (main house and new ADU) shall be minimum 1-hour fire partition. Fire rated floor-ceiling and wall assemblies shall extend to and be tight against the exterior wall, and wall assemblies shall extend from the foundation to the underside of the roof sheathing. Provide details on the plans. (R302.3 CRC)
[Comment not completely resolve – provide manufacture test assembly number to detail 6/4. ASTM E90 is the testing requirement, not the manufacture assembly number]
☒6. Walls separating dwelling units shall provide airborne sound insulation for walls with an STC rating of at least 50 per. Provide details on plans and provide verification of a tested assembly to achieve the required STC rating of 50.
[Comment not completely resolve – see review comment number 5 above]
☒7. Every dwelling unit shall be provided with heating facilities capable of maintaining a room temperature of not less than 68°F (20°C) at a point 3 feet (914 mm) above the floor and 2 feet from exterior walls in habitable rooms at the design temperature. The installation of one or more portable space heaters shall not be used to achieve compliance with this section. (R303.10)
[Comment resolved]
☒8. Attic access and Ventilations –
☒Show location(s) of 22" x 30" attic access with 30" minimum clear headroom. (R807.1)
☒Show on the plans - attic vent locations, type and size (area = 1/150 of the attic space). Provide an attic cross ventilation summary; on the plans indicate the total area required versus provided. (R806.1). Use of 1/300 factor does not meet the exemption of the code. Revise the calculation or provide attic location that meet the requirement of the code.
[Comment resolved]
☒9. Aging-in-place Design & Fall Prevention – (R327)
☒Reinforcement for grab bar: at least one bathroom on the entry level shall be provided with reinforcement installed. Where there is no bathroom on the entry level, at least one bathroom on the second or third floor of dwelling shall comply
Reinforcement shall be solid lumber or other construction materials approved by the enforcing agency.
Reinforcement shall not be less than 2x8 inches nominal lumber or other construction material provide equal height and load capacity. Reinforcement shall be located between 32 inches and 39 ¼ inches above the finished floor flush with the wall framing
Water closet reinforcement shall be install on both side walls of the fixture, or one side wall and the back wall
Shower reinforcement shall be continuous where wall framing is provided
Bathtub and combination bathtub/shower reinforcement shall be continuous on each end of the bathtub and the back wall. Additionally, back wall reinforcement for a lower grab bar shall be provided with the bottom edge located no more than 6 inches above the bathtub rim
☒Electrical receptacle outlet, switch and control height: Electrical receptacle outlets, switches and control (including controls for heating, ventilation and air conditioning) intended to be used by occupants shall be location no more than 48 inches measured from the top of the outlet box and not less than 15 inches measured form the bottom of the outlet box above the finish floor
☒Doorbell buttons: doorbell buttons or controls, when installed, shall not exceed 48 inches above exterior floor or landing, measured from the top of the doorbell button assembly. Where doorbell buttons integrated with other features are required to be installed above 48 inches measured from the exterior floor or landing, a standard doorbell button or control shall also be provided at a height not exceed 48 inches above exterior floor or landing, measure from the top of the doorbell button or controls.
[Comment resolved]
Energy Conservation – Title 24 Energy forms & calculations
☒1. Kitchen shall be vented to the outside. On the plan, please show exhaust fan(s) in kitchen (100 cfm minimum).
[Comment resolved]
☒2. Water Heating system (water heater) – (Section 150.0(n)) Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n).
A. If the designated space is within 3 feet from the water heater:
i. A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater.
ii. Isolate both ends of the unused conductor.
iii. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker
iv. A condensate drain that allows natural draining of the water heater.
B. If the designated space is more than 3 feet from the water heater: see additional Code requirements.
When a second water heater is installed as part of the addition shall comply with Section (150.2(a)(D).
[Comment resolved]
CalGreen Plan Review Comments:
☒1. Show plumbing fixtures flow rate limitation (Section 4.303)
Water closet – 1.28 gallon per flush
Shower head – 1.8 gallons per minute at 80 psi.
Lavatory faucets – 1.2 gallon per minute at 60 psi.
Kitchen faucet – 1.8 gallon per minute at 60 psi.
[Comment resolved]
Structural Plan Review Comments:It is under the presumption that conversion is design based on the code prescriptive method. All aspect of design such as shear wall length, the location of shear wall, shall comply with the prescriptive method; otherwise, provide structural calculation justification. Further review is required.[Comment not resolve – Shear wall length and location of the shear wall does not comply with the prescriptive method. Please provide structural calculation for justification for the lateral analysis. As per pervious review comment indicated that all CRC prescriptive method shall comply with to the prescriptive method. (CRC 602.10)] Sheet 4: Show new shear wall location at the wall separating the (N) ADU and (E) main house on both the framing plan and the foundation plan.[Comment resolved]☒Additional Review Comment:
For the purpose of Park & Rec Development fee calculation, please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet. Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.
[Comment resolved]
Note on plan: The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”.
[Comment resolved]
Sheet 3
East Elevation: verify background. It does not match plan. Plan shown 4 windows openings
[Comment resolved]
North Elevation: verify background. It does not match plan. Plan shown 4 windows and 1 man door (not French door)
[Comment resolved]
Red marked comment set is available to pick-up at the City Hall.☒ 2ndReview Comment 7/3/2024:
Sheet 1, sheet index: sheet 4A and sheet 7 are missing from the submittal set. Please provide for review or update/delete sheet index
Sheet 4, Detail 1: provide legible note(End of Comment)