Loading...
HomeMy WebLinkAbout319627_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101120539 PROJECT ADDRESS: 1025 W Twentieth St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/23/2024 INITIAL REVIEW 9/5/2024 EXPIRATION 2/19/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Tom Morrissey 3. TEL: (714)836-6137 FAX: VALUATION: EMAIL: tmorrissey@lmarchitecture.com FLOOD ZONE: X-06059C0144J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Applicant must pick up red marked sheet from the City prior to resubmittal and return the marked up set with resubmittal PLAN REVIEW COMMENTS:Sheet A-2.05PCPatio Roof PlanPlease provide detail 17/A-4.01 for review Please specify if the solar panel is to be installed at the time of the patio cover permit is issuance? If so, a separate permit is required. Or will it be installed at a later time (solar ready). Sheet S1Scope of work: please coordinate with architect if rolling panel door is a part of this permit; otherwise delete from scope of workSheet S3New patio roof framing plan: provide lateral analysis (wind & seismic) justify 2-6x6 cantilever post are adequate to sustain lateral load. Demonstrate that the load is capable transferring to foundation with overturning moment at the bottom of the cantilever post. Detail 14 Provide new plywood thickness and nailing pattern Provide connection for 2 eave to (E) rafter Sheet SD1Detail 14: provide reference of this detail on plan where applicable Detail 18: provide reference of this detail on plan where applicable(End of Comment)