Loading...
HomeMy WebLinkAbout317431_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 104119801 PROJECT ADDRESS: 3122 S Halladay St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/1/2024 INITIAL REVIEW 7/7/2024 EXPIRATION 12/28/2024 RECHECKS: 1.9/4/24 PROJECT APPLICANT CONTACT PERSON: 2. Aaron Baggaley 3. TEL: (916)502-0467 FAX: VALUATION: $10,000.00 EMAIL: aaron@deltagc.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application: - Revise project job description on the building permit application worksheet to reflect the work to be done under the subject building permit application. ( To include changing wood door with electric metal door)This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePer code enforcement citation, a wood door replaced by an electric metal door , please show on the floor plan.Ok 9/4/24Provide all requirements per CBC for the electric door. Pending 9/4/24, Show all the exit doors and show they are openable from inside without use of any key or knowledge, provide requirements from CBC 1010.2.12Is it a door with a card reader? If it is show compliance with CBC 2022.Pending 9/4/24, provide height of the card reader. Provide requirements from CBC 1010.2.11.CBC 11B-303, Regardless of the occupant load, there will be a floor landing at each side of the door. And show threshold complies with accessibility.Pending 9/4/24, Not foundCBC Section 11B-404.2.7.Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Ok 9/4/24CBC Section 11B-404.2.9, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. Ok 9/4/24Complete the attached Disabled Accessibility Documentation Form. 9/4/24 Call out all new and existing card readers on the floor plan.