Loading...
HomeMy WebLinkAbout319900_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101120632 PROJECT ADDRESS: 2390 S Redhill Ave PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/3/2024 INITIAL REVIEW 9/20/2024 EXPIRATION 3/2/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Alan Bagatourian 3. TEL: (818)624-5747 FAX: VALUATION: $350,000.00 EMAIL: alan@benashiron.com FLOOD ZONE: X-06059C0279J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationSubmitted documents shall be fully bound through staples or rings and organized in page order intended. Please provide resubmittal fully bound.Calculation and drawing set shall be review stamped by AOR/EOR. Stamp and date shall be applied to calculation package and drawing. Stamp on transmittal letter does not suffice. (End of Comment)