HomeMy WebLinkAbout315735_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101119273
PROJECT ADDRESS:
932 W Eighteenth St Unit# 2
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/14/2024
INITIAL REVIEW
6/10/2024
EXPIRATION
11/10/2024
RECHECKS:
1.9/17/2024
PROJECT APPLICANT CONTACT PERSON:
2.
Otulio Gutierrez
3.
TEL:
(949)235-2400
FAX:
VALUATION: $130,000.00
EMAIL:
OGutierrez@mircomgroup.com
FLOOD ZONE: X-0602320144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
An application for a permit for any proposed work shall be deemed to have abandoned / expired after 180 days of the date of filing, unless such application has been issued.
Sheet A03:
The following are the mandatory requirement per 2022 California Energy Code, Section 150.0:
(n) Water heating system.
1. Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater
A. If the designated space is within 3 feet from the water heater:
i. A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater.
2nd Review Comment: Please show a dedicated 125 volt, 20 amp electrical receptacle for the new heat pump water heater.
ii. Isolate both ends of the unused conductor.
iii. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker
iv. A condensate drain that allows natural draining of the water heater.
B. If the designated space is more than 3 feet from the water heater: see additional Code requirements.
(s) Energy Storage Systems (ESS) ready.
All single-family residences that include one or two dwelling units shall meet the following:
1. At least one of the following shall be provided:
A. ESS ready interconnection equipment [auto transfer switch and panel] with a minimum backed-up capacity of 60 amps and a minimum of four ESS-supplied branch circuits, or
B. A dedicated, minimum 1”raceway from the main service to a subpanel that supplies the branch circuits in Section 150.0(s)(2).
2. A minimum of four branch circuits shall be supplied by the ESS: the refrigerator, one lighting circuit shall be located near the primary egress, and at least one circuit shall supply a sleeping room receptacle outlet.
3. The main panelboard shall have a minimum busbar rating of 225 amperes with space to install future isolation equipment/transfer switch within 3 feet.
(t) Heat pump space heater (Furnace) ready.
Systems using gas or propane furnace to serve individual dwelling units shall include the following:
A dedicated 240 volt, minimum 30A branch circuit wiring shall be installed within 3 feet from the furnace for a future heat pump space heater installation.
2nd Review Comment: Show 240 volt, minimum 30A branch circuit receptacle outlet ready for future installation of heat pump.
(u) Electric cooktop ready.
Systems using gas or propane cooktop to serve individual dwelling units shall include the following:
1. A dedicated 240 volt, minimum 50A branch circuit wiring shall be installed within 3 feet from the cooktop for a future electric cooktop installation.
2nd Review Comment: Show 240 volt, 50 amp branch circuit receptacle outlet ready for future installation of electric cooktop.
(v) Electric clothes dryer ready.
Clothes dryer locations with gas or propane plumbing to serve individual dwelling units shall include the following:
1. A dedicated 240 volt, minimum 30A branch circuit wiring shall be installed within 3 feet from the clothes dryer location for a future electric clothes dryer installation.
2nd Review Comment: Show 240 volt, 30 Amp branch circuit receptacle outlet ready for future installation of electric dryer.
Sheet A04:
2nd Review: Roofing assembly – Please specify radiant barrier is required per Title 24 Energy compliance forms.
Sheet GR1:
Per City of Santa Ana grading exemption, the exemption checklist and the Site Drainage plan must be completed and designed by a California registered civil engineer.
2nd Review Comment: The new grading waiver checklist (delta 4) – The building is not located in FEMA zone A or AE. Please update form to answer “Yes”.
Title 24 Energy Calculation
2nd Review Comment: The square footage of the building has been changed. For consistency, please revise Title 24 calculation to match with the building conditioned space. Update forms onto the plans.
Structural Review:
Plan shall be drawn to scale. The Framing plan and foundation did not match ¼” : 1’ Scale as shown. Please revise plan to scale.