HomeMy WebLinkAbout318201_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101120079 and 101120080
PROJECT ADDRESS:
415 E Fourth Stand 515 E Fourth St
PLAN CHECK ENGINEER:
Lee, Wayne / Gary HuangTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
I A, III A, SPK HT Increase, SPK Story Increase
OCCUPANCY CLASSIFICATION(S):
A-2, A-3, B, M, R-2, S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/18/2024
INITIAL REVIEW
8/1/2024
EXPIRATION
1/14/2025
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Andrew Nelson
3.
TEL:
(310)880-0888
FAX:
VALUATION:
EMAIL:
anelson@redoakinv.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note āN/Aā and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
-Police Department approval on the corrected/final set of drawings (647-5840).
PLAN CHECK COMMENTS
Update and submit sheet A0-01. Provide a narrative of the scope of work for this revision delta #2.
Submit sheet AD-21 with detail #23. Refer to sheet A5-98 section #1 as detail called out at the top of trash room.
Structural Plan Review Comments By Garry Wang, PE.:Phone number: 714-647-5862
Email:ghuang@santa-ana.org
Sheet S2-12N:
Indicate 6x12 framing location at grid line 10N/A
Sheet S2-13N:
Indicate 6x12 framing location at grid line 10N/A
Sheet S2-14N:
Indicate 6x12 framing location at grid line 10N/A
Sheet S2-14S:
Provide full section detail at outrigger illustrate the relative location for HSS10x6 and PSL 5 ¼ HDR, also including the moment connection for HSS4x4x3/16 outrigger to HSS10x6 connection. Detail 20/S8-02 is not applicable. Provide calculation justification for welding connection is adequate
Provide location/dimension of (2) 4x12 supporting window extension on plan at grid line 1S/T
Indicate 6x12 framing location at grid line 1S/M
Indicate 6x12 framing location at grid line 13S/M
Indicate 6x12 framing location at grid line 13S/R
Sheet S2-15N:
Indicate 6x12 framing location at grid line 10N/A
Sheet S2-15S:
Provide location/dimension of (2) 4x12 supporting window extension on plan at grid line 1S/T
Indicate 6x12 framing location at grid line 1S/M
Indicate 6x12 framing location at grid line 13S/M
Indicate 6x12 framing location at grid line 13S/R
Sheet S2-16N:
Provide support for 6x12 cantilever beam. Provide location of the supporting beam at grid 10N/A
Indicate 6x12 framing location at grid line 20N/L
SEOR to verify tie-off framing member size. Plan S2-16N calls out PSL 71/4, detail 14/S5-06 calls GLB 3 1/2
Sheet S2-16S:
Indicate 6x12 framing location at grid line 1S/M
Indicate 6x12 framing location at grid line 1S/P
Provide location/dimension of (2) 4x12 supporting window extension on plan at grid line 1S/T
Indicate 6x12 framing location at grid line 13S/M
Indicate 6x12 framing location at grid line 13S/P
Indicate 6x12 framing location at grid line 13S/R
Sheet S2-17S:
Indicate 6x12 framing location at grid line 1S/M
Indicate 6x12 framing location at grid line 1S/P
Provide location/dimension of (2) 4x12 supporting window extension on plan at grid line 1S/T
Indicate 6x12 framing location at grid line 13S/M
Indicate 6x12 framing location at grid line 13S/P
Indicate 6x12 framing location at grid line 13S/R
Sheet S2-51N:
SEOR to verify/coordinate stair detail at grid line B21/BB. Architectural drawings show pre-fab steel stair.
Sheet S2-51S:
SEOR to verify. Detail 7/S3-01 seems not applicable at this location.
Sheet S2-53S:
For balcony at grid BM/B14 and grid BM/B15, SEOR to provide justification for connection for Simpson SDS screw at detail 11/S-501. 6x12 supporting beam become cantilever, verify Simpson SDS is adequate.
Sheet S2-55N:
SEOR to verify at grid line BJ/B16, if floor deck is concrete over metal deck, detail 17/S7-02 should not be applicable.
At both grid line BJ/B16 and BD/B20, SEOR to verify C3x4.1 connection to CMU wall, and connection to W-flange beam. Both referenced details 13/S7.02 and 15/S8-03 are not applicable. Per detail 15/S7.02, the C-channel is installed upside down.
Sheet S2-55S:
For balcony at grid BM/B14 and grid BM/B15, SEOR to provide justification for connection for Simpson SDS screw at detail 11/S-501. 6x12 supporting beam become cantilever, verify Simpson SDS is adequate.
SEOR to verify at grid line BJ/B16, if floor deck is concrete over metal deck, detail 17/S7-02 should not be applicable.
At grid line BJ/B16, SEOR to verify C3x4.1 connection to CMU wall, and connection to W-flange beam. Both referenced details 15/S7.02 and 15/S8-03 are not applicable. Per detail 13/S7.02, the C-channel is installed upside down.
Sheet S2-56N:
SEOR to verify tie-off framing member size. Plan S2-16N calls out PSL 71/4, detail 14/S5-06 calls GLB 3 1/2
Sheet S2-56S:
SEOR to verify tie-off framing member size. Plan S2-16N calls out PSL 71/4, detail 14/S5-06 calls GLB 3 1/2
SEOR to verify details 16/S5-05, and 10/S5-05 at overhang seems not consistent with each other. Detail 10/S5-05 has wall framing directly framed into the slope roof, and detail 16 indicate the roof frame is flat and built overframe on top of flat roof. Please coordinate. Also, please clarify how overframe is being constructed when overhang is perpendicular to roof joists.
Sheet S5-01:
Detail 1:
The original approved detail, the landing were built-into the wall framing. The revised detail has landing separate from stud wall. SEOR to clarify the lateral resisting system to the stair. Provide structural calculation justification.
Provide landing beam size on plan, and also indicate supporting member (column?) on plan, typical at all stairs
Sheet S5-07:
Detail 17: provide detail āDā for review
Sheet S8-03:
Detail 8: SEOR to specify only one connection. Detail 18/S601 not found, and detail 20/S802 is HSS to HSS beam connection. Detail 1/S8-03 has welded plate outside of the HSS tube. Detail 8/S8-03 show slotted plate into HSS column. Revise the detail to match the intended connection