Loading...
HomeMy WebLinkAbout319475_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101120491 PROJECT ADDRESS: 1262 S Lyon St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/20/2024 INITIAL REVIEW 9/11/2024 EXPIRATION 2/16/2025 RECHECKS: 1.9/26/24 PROJECT APPLICANT CONTACT PERSON: 2. Daniel B. Beauchamp 3. TEL: (949)727-3840 FAX: VALUATION: $5,000.00 EMAIL: danb@beauchamparchitects.com FLOOD ZONE: X-06059C0276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840)Sheet A2.0: Check existing footing for the concentrated loads from the supporting post. 2nd Review Comment: The existing footing is 18” deep measured from top of slab to bottom of footing, per approved plan. Please revise calculation accordingly. Enlarged footing may be required. There is no permit record for the existing opening between the office area. It should consider as part of this permit application and provide information for the opening, including structural frames and calculation. 2nd Review Comment: Detail 3/A2.0 – 2x trimer with toe nails are insufficient. Please revise plan and detail to provide 4x post with post cap supporting the ceiling beam. The existing 4x4 post cut to fit to new beam – Please reinforce post with post cap (Simpson AC) between the 4x4 to beam.