HomeMy WebLinkAbout317229_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 104119734 PROJECT ADDRESS: 2781 W MacArthur Blvd Unit# J PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/25/2024 INITIAL REVIEW 8/6/2024 EXPIRATION 12/22/2024 RECHECKS: 1.10/10/24 PROJECT APPLICANT CONTACT PERSON: 2. Tony Rocha 3. TEL: (949)328-9270 FAX: VALUATION: $65,000.00 EMAIL: tony@aarochaco.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2022 California Building Standards Code with local amendments.Clearly indicate the scope of work under this building permit application: - Revise project job description on the building permit application worksheet to reflect the work to be done under the subject building permit application. - Construction drawings must clearly show all work to be done under the subject building permit application.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.OK 10/10/24Provide the following:OK 10/10/24 - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan.Show on the plans:OK 10/10/24 - Occupancy Classification(s) - Type of Construction - Fire Sprinkler System (State purpose of sprinkler system, for example, area increase under CBC Section 506.3, required by CBC Section 903 for type of occupancy, etc.)Provide typical section view detail of all new partitions and ceilings showing:Pending 10/10/24 , unpermitted walls considered new wall. Provide detail. - Size, spacing, and material of framing members - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above.Provide on the drawings a complete door schedule, showing: - Door sizes (CBC Sections 11B-404) - Hardware complying with exiting and disabled accessibility requirements Pending 10/10/24Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”OK 10/10/24All doors require a level floor landing on each side in accordance with CBC Sections 1010.1.5, Provide typical door threshold details and details of change in floor covering material.OK 10/10/24The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for interior doors. ( For service room)OK 10/10/24Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. Pending 10/10/24The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 48” as measured at right angles to the plane of the door in the closed position. 11B-404.2.4.4.( Provide minimum 48” landing at the front of all doors).OK 10/10/24CBC Sections 11B-303. Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.OK 10/10/24CBC Section 11B-404.2.7, Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.OK 10/10/24CBC Section 11B-404.2.9, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. OK 10/10/24Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.OK 10/10/24CBC Section 1013.1. Provide a directional exit sign at changes in exiting direction.OK 10/10/24Tactile exit signs shall be required at the following locations:OK 10/10/24 - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.OK 10/10/24Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4:Pending 10/10/24 - An accessible entrance - An accessible route to the altered area - Accessible restroomsPending 10/10/24 - Accessible drinking fountains, and - Parking, signage and alarmsCBC Section 11B-206. Entrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.OK 10/10/24If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B-247.1.2.5Pending 10/10/24 , provide 36” deep. See red mark.CBC Section 11B-406.5.3. Curb ramps shall comply with CBC Section 11B-406.Pending 10/10/24, provide slope.Each lot or parking structure where parking is provided for the public as clients, guest or employees, shall provide accessible parking as required by CBC Section 1129B.OK 10/10/24CBC Section 11B-208.2.4. One in every six accessible spaces, but not less than one, shall be served by an access aisle 8’-0” (96”) wide minimum and shall be designated van accessible as required by Section 11B-502. The words NO PARKING shall be painted on the ground within each eight’ loading and unloading access aisle. This notice shall be painted in white letters no less than 12” high and located so that it is visible to traffic enforcement officials. OK 10/10/24Sanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC Section11B-603 and 11B-604.3.1.Pending 10/10/24, provide 7”-9” clearance from the toilet to toilet dispenser.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 11B-603 and 11B-604 and the California Plumbing Code.OK 10/10/24CBC Section 11B-606.5. Note on the drawings hot water and drain pipes under lavatory shall be insulated.OK 10/10/24 Provide complete door schedule for existing and new doors.OK 10/10/24Provide complete ceiling plan and show new and existing ceiling. Pending 10/10/24, show if it is existing or new.Please fillout attached Accessible compliance form.Pending 10/10/24, not found.Please note this is not complete plan review since the drawings are incomplete additional plan check might be given at the time of resubmittal.