HomeMy WebLinkAbout319558_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101120524
PROJECT ADDRESS:
1907 S Maple St Unit# 2
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/22/2024
INITIAL REVIEW
9/25/2024
EXPIRATION
2/18/2025
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Danny Rodriguez
3.
TEL:
(714)926-4389
FAX:
VALUATION: $20,000.00
EMAIL:
drodjr50@gmail.com
FLOOD ZONE: X-06059C0276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☒Police Department approval on the corrected/final set of drawings (647-5840).
☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A-1
Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet. Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”.
Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection.Designer info/contact shall be provided in Title Block or Cover Sheet. Verify existing bedroom shown on plan between bathroom and dining room. City approved permit for enclosed patio does not show bedroom at this location. Bedroom emergency egress windows are not permitted to go into an enclosed patio cover. If existing bedroom does occur at this location, enclosed patio shall be revised or bedroom removed. Specify shear wall type at all WSP shown per Shearwall Schedule on Sheet D2.0.Wall on Plan East side of ADU requires 1-hour fire rating. Specify on plan where required and provide detail for wall.Roof projection spanning within 2’-0” to 5’-0” from property line requires 1-hour fire rated underside. Specify on drawings where required and provide detail.Provide carbon monoxide alarm inside new ADU.Identify where new wall occurs at garage door infill on plan. New walls shall be hatched accordingly.New ADU Door has direct access to pull, identify new ADU door shall have alarm to meet pool standards.
The following Electric Ready notes shall be added and constructed for new detached residential structures:
Water Heating system (water heater) – (Section 150.0(n))
Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n).
If the designated space is within 3 feet from the water heater:
A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater.
ii. Isolate both ends of the unused conductor.
A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker
A condensate drain that allows natural draining of the water heater.
. If the designated space is more than 3 feet from the water heater: see additional Code requirements.
When a second water heater is installed as part of the addition shall comply with Section (150.2(a)(D). Sheet 2Provide weep screed detail at garage door infill. Verify how weep screed requirements met at existing driveway if driveway is flush with slab on grade.Sheet SD2Verify if existing or new ceiling joist in ADU Conversion. If new ceiling joist, provide attic access and roof ventilation calculations as required.Detail 1/SD1 referenced at foundation does not reference any detail sheet provided. There is no SD1 found. (End of Comment)