Loading...
HomeMy WebLinkAbout321374_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101121103 PROJECT ADDRESS: 2907 S Oak St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/8/2024 INITIAL REVIEW 10/29/2024 EXPIRATION 4/6/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Martin Santos 3. TEL: (949)241-6933 FAX: VALUATION:$13,000.00 EMAIL: martin@sanboxco.com FLOOD ZONE:X-06059C0278J GUIDELINES/INSTRUCTIONS: Applicant must pick up red marked sheets from the City prior to resubmittal and return the marked up set with resubmittal. The drawings markups (Redlines) are available to pick up at the Building Division counters by walk-ins. Appointments are not required. Our business hour is Monday through Thursday and alternative Fridays from 8:00 am to 3:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit. Plan Check Comments Instructions - Review all corrections and provide a written response.All items noted on this plan-check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker. Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used Resubmit twoResubmittal Instructions – Provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below: Resubmittal Bin: Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit. Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins. Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project. GENERAL REQUIREMENTS Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Plan Check Expiration – This plan check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the extension request is approved, all plan checks will expire after 360 days from the submittal date. No further extension will be granted after 360 days from the submittal date. MEP Reviews – This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. PLAN REVIEW COMMENTS:For fence that is facing the Dyer RoadVerify if man door existing on the building parameter wall. Provide enlarge plan for Provide accessible door/gate. Maneuvering clearance shall comply with CBC 11B-404.2.4.1Provide clear path/accessible route to public walk way per 11B-403.5.10For fence that is facing the Oak StreetProvide enlarge plan indicateManeuvering clearance comply with 11B-404.2.4.1 for the gateExist discharge shall provide a direct and unobstructed access to a public way per CBC 1028.5. Indicate on plan “NO PARKING” in a hatched areaIndicate on plane the clear width per 11B-403.5.1Fence gate detailProvide door hardware height per 11B-404.2.7Indicate on plan door opening force per 11B-404.2.9Indicate on plan door smooth surface dimension per 11B-404.2.10Indicate gate/door height (End of Comment)