HomeMy WebLinkAbout315737_4_Corrections.docxPLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101119274
PROJECT ADDRESS:
2600 S Redhill Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V A, SPK
OCCUPANCY CLASSIFICATION(S):
R-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/10/2024
INITIAL REVIEW
6/16/2024
EXPIRATION
12/7/2024
RECHECKS:
1.8/28/24
PROJECT APPLICANT CONTACT PERSON:
2.10/5/24
Colin Jachnke
3.
TEL:
(213)233-2144
FAX:
VALUATION: $1,700,000.00
EMAIL:
jmanalo@burnhamnationwide.com
FLOOD ZONE: X-0602320279J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Information:An application for a permit for any proposed work shall be deemed to have abandoned / expired after 180 days of the date of filing, unless such application has been issued.Sheet A413a: Guest accessible restroom detail 2/A430b: 3rd Review Comment: Response was insufficient. Please provide the following: Floor plan sheet A413a – Please show dimensions of 60” clear landing on the pull side of restroom door with 18” clear from door strike edge. Detail 2/A430b: Please revise detail to show the 60” clear turning circle within (inside) the accessible restroom. In addition, the 60” landing with 18” clear from door strike edge is required outside of the restroom (maneuver space for door). Sheet A414a: Guest accessible restroom detail 9/A430b: 2nd Review Comment: Please provide all the requirement information below. A 36 inch wide minimum by 60 inch long minimum clearance shall be provided adjacent to the open face of the shower compartment.3rd Review Comment:The lavatory cannot encroach into the 36” x 60” clearance outside of the standard roll-in shower. Alternate roll-in shower complying with Section 11B-608.2.3 may be used. Please coordinate and revise plans accordingly. Thresholds in roll-in type shower compartments shall be 1/2 inch high maximum in accordance with Section 11B-303. (11B-608.7)3rd Review Comment: Detail 9/A040 called out for finish floor between shower and area outside of shower compartment was not applicable. Please provide detail. (End of Comment)