HomeMy WebLinkAbout322110_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101121358 PROJECT ADDRESS: 2018 S Evergreen St Unit# 2 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/28/2024 INITIAL REVIEW 11/15/2024 EXPIRATION 4/26/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Benito Cororei 3. TEL: (714)371-7176 FAX: VALUATION: $50,000.00 EMAIL: bcndesigner@sbcglobal.net FLOOD ZONE: X-06059C0276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Revise the project address to “2018 S Evergreen Street Unit #2, Santa Ana, CA. 92707”. Please ensure the correct address is updated throughout the construction document. For example, address on the title block of every sheet, title page on structural calculations, and line 3 on page 1 of the CF1R document. Development fee:For the purpose of Park & Rec Development fee calculation, please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses. Development fee:Note on plan: The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”. Sheet A-2. Provide 1-hour fire-rated exterior wall and roof overhang design where the exterior wall is located within 5 feet parallel to the lot line. Details are required on plan. Sheet A-2. Clarify the door size leading to the bedroom. The size shows 4668 in the door schedule does not match floor plan. Sheet A-3. Provide window design for type A window. STRUCUTRAL Revise the project address to “2018 S Evergreen Street Unit #2, Santa Ana, CA. 92707”. Revise all structural sheets and cover page of structural calculation. Sheet S-1. Provide framing detail for kicker design. Refer to framing note #1 on roof framing plan. Design the connection, bracing and members with continuous load path from the roof to the supporting member. END OF COMMENTS