HomeMy WebLinkAbout322301_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101121425 and 101121426 PROJECT ADDRESS: 1433 and 1437 S Standard Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/5/2024 INITIAL REVIEW 12/4/2024 EXPIRATION 5/4/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Blanca Valle 3. TEL: (323)602-6556 FAX: VALUATION: $12,000.00 EMAIL: vblanca718@gmail.com FLOOD ZONE: X-06059C0276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.PLAN CHECK COMMENTSAll items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Please see additional corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1). Sheet A-2.0. There are two buildings and two permit numbers sharing the same plans. Show separate stairway floor plan for each building and label (N) to identify the scope of work area. Please clearly identify guardrails and handrails on plans, sections and elevations. Do not combine handrail and guardrails. Show them separately with dimensions on the handrail extensions called out. Sheet A-2.0. Show stairway width on plan on each stairway. Minimum stairway shall be 44” wide or 36” minimum with maximum occupancy load served on each stairway less than 50. If the stairway is less than 44”, justify occupant load served on the stairway. CBC 1011.2 Show stair riser height and tread depth on plan complying with CBC 1011.5.2. Provide actual dimensions. Risers shall be solid. The elevation shows open riser is not permitted. Revise plan to clarify. 1011.5.5.3. Note on plan: “Stair treads and risers shall be of uniform size and shape. The tolerance between the largest and smallest riser height or between the largest and smallest tread depth shall not exceed 3/8 inch in any flight of stairs. The greatest winder tread depth at the walkline within any flight of stairs shall not exceed the smallest by more than 3/8 inch.” CBC 1011.5.4 Show landing dimensions on the architectural plans. Dimensions are required for top, intermediate and bottom landing. CBC 1011.6. Flights of stairways shall have handrails on each side and shall comply with Section 1014. Provide handrail cross-section on plan complying with either type I or type II with CBC 1014.3 Where handrails are not continuous between flights, the handrails shall extend horizontally not less than 12 inches beyond the top riser and continue to slope for the depth of one tread beyond the bottom riser. CBC 1014.6 Projections into the required width of aisles, stairways and ramps at each side shall not exceed 41/2 inches at or below the handrail height. CBC 1014.8. In addition to handrail, provide guardrail on the open-sided walking surface on the stairs and landings. Plans shall clearly show separate rails and comply with their own code requirements. Required guards shall be not less than 42 inches (1067 mm) high, measured vertically as follows: From the adjacent walking surfaces. On stairways and stepped aisles, from the line connecting the leading edges of the tread nosings. ACCESSIBILITY- reviewed as not a public housing project Pending Please indicate on the cover sheet the first occupancy date of the buildings. The notes on the cover sheet shows accessibility is not required. Please justify. The building standards contained in this chapter do not apply to the alteration, repair, rehabilitation or maintenance of multifamily dwellings constructed for first occupancy on or before March 13, 1991. Covered multifamily dwellings shall be maintained in compliance with the accessibility standards in effect at the time of construction. Apartments constructed prior to March 13, 1991 shall be maintained in compliance with the accessibility standards in effect at the time of construction. 1102A.2 STRUCTURAL All sheets. Show address of each building on the title block. 1433 and 1437 S Standard Avenue. Details of handrails or guardrails in sheet D-01 shall meet code requirements in CBC Ch10. Please coordinate with the architect, architectural drawings and meet the correction comments above. Detail 2/D1. Specify required reinforcement, anchor bolt and anchor bolt embedment in the concrete footing. Detail 5/D1. Tread depth shall between 4” minimum and 7” maximum. Detail 1/D3 does not exist. Please provide correct detail on sheet S-1. Framing and foundation plans appears not matching structural calculation: Calculation page 5. Review beam #1 design. Sheet S-1 shows beam #1 is supported at each end (new footing and existing 3” pipe) (N4?) and beam #1 is supporting beam #2. Please include the design load from beam #2 into beam #1 and correct support of beam #1 in the calculation. Calculation page 5. Provide footing at the lower end of beam #2. Detail 3/D-2 and framing plan does not provide vertical support. Calculation page 4. Provide beam #4 calculation. Sheet S-1. On the right building. Framing/foundation plan shows one dashed line appears as a beam. Please clarify and provide structural design for the beam and its support on plan. END OF COMMENTS