HomeMy WebLinkAbout322832_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101121608
PROJECT ADDRESS:
1602 N King St Unit# J-3
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/15/2024
INITIAL REVIEW
11/24/2024
EXPIRATION
5/14/2025
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Allison Pridy
3.
TEL:
(562)746-2714
FAX:
VALUATION: $300,000.00
EMAIL:
allpermits@gmail.com
FLOOD ZONE: X-06059C0144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A0.11New window in Master Bedroom size (height) noted does not match window schedule. Please revise to match. Sheet A2.07Provide ICC # for proposed new roof shingles. Sheet A7.01Specify clear opening dimensions for double sliding egress window. Sheet E1.01Provide Carbon Monoxide alarm directly outside vicinity of bedrooms on second floor.Provide Smoke Detector and Carbon Monoxide alarm on first floor.Sheet S2.1Show framing around new attic access.Justify 2nd floor bearing wall supports. Specify bearing load path on plans. Provide existing foundation plan to clarify existing bearing wall support. Specify existing lateral system on plans or note no lateral system replacement is required or will be done.Justify roof rafter mid span support noted in calculation design at location where joists are supported by single bearing wall on plan. Verify how mid span support to occur or revise calculations as needed. Sheet S2.2Verify if there is to be a connection between existing and new ridge board.Provide size for all hip members shown on plan. Plan is a little unclear as to how framing layout works in reference to isometric view. Sheet S3.0Detail 4 – Specify shear transfer from new diaphragm to lateral system. Sheet S4.0Detail 2 – Clarify 2x6 between. Provide connection for sistering or reference 2/S3.0.Detail 2 – Provide connection for hip beams at ends.Detail 2 – Plan does not specify 2-2x ceiling joists at this location, revise plans as needed.Detail 3 – Clarify where 2-2x6 at ridge occurs on plan. Detail is unclear where items occur with where detail reference provided on plan.Detail 3 – Specify anchor/rod information for HDU2.Detail 4 – Provide calculation for compression/span of 2x4 brace for longer span brace.(End of Comment)