HomeMy WebLinkAbout321403_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101121113
PROJECT ADDRESS:
1630 E St Gertrude Pl
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/9/2024
INITIAL REVIEW
10/12/2024
EXPIRATION
4/7/2025
RECHECKS:
111/22/24
PROJECT APPLICANT CONTACT PERSON:
2.
Mark Dupuy
3.
TEL:
(562)577-4645
FAX:
(562)804-7101
VALUATION: $80,000.00
EMAIL:
markdupuy@msn.com
FLOOD ZONE: X-06059C0276J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2022 California Building Standards Code with local amendments.Clearly indicate the scope of work under this building permit application:
- Revise project job description on the building permit application worksheet to reflect the work to be done
under the subject building permit application.
- Construction drawings must clearly show all work to be done under the subject building permit application.
- Delete all notes and details from drawings that are not a part of the work to be done under the subject building
permit application Pending,n. This includes mechanical, plumbing and electrical work that is not specifically required by the Building Code.pending 11/22/24, remove all unrelated details and sheetsThis review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)- Public Works Agency approval
- Orange County Sanitation District (714) 593-5756
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Remove all unrelated details including unrelated framing details.Pending 11/22/24Provide the following:OK 11/22/24
- Disabled access compliance must be shown on the site plan.Provide detail to show path of travel to include dimension and slope.OK 11/22/24 Provide existing floor plan.OK 11/22/24Provide new floor plan.OK 11/22/24Provide a wall legend indicating whether the wall is:Pending 11/22/24,- Existing, new, or to be removed: Pending 11/22/24, callout detail for new walls on the floor planOccupancies using hazardous materials are subject to special requirements. It is the applicant’s/owner’s responsibility, PRIOR TO SUBMITTAL, to make this known to the Building, Planning, or Fire Departments.Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.Pending 11/22/24Provide on the drawings a complete door schedule, showing:
- Door sizes (CBC Sections11B-404)
- Hardware complying with exiting and disabled accessibility requirements Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4.Ok 11/22/24
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsCBC Section 11B-403.5.1. Every portion of every building in which are installed seats, tables, merchandise, equipment, or similar materials shall be provided with aisles leading to an exit. Every aisle shall not be less than 36” wide if serving only one side, and not less than 44” wide if serving both sides. ( between the storage racks)Ok 11/22/24Provide exit plan to include new storage racks in the back.Pending 11/22/24,also provide for new Cultivation rooms.Is there any new storage rack? Provide complete detail and engineering calculation for storage racks over 8’ tall. For storage racks between 6’-8’ provide attachment detail.Pending 11/22/24 Sheet A-6, shows 11’-10” high storage rack, please clarify and call it on the drawingsIdentify items in the drying room. Drawings shall be legible.Please verify if there is any new mechanical unit. If there is provide location of the new units. Engineering calculation and details might be required.Complete the attached Disabled Accessibility Documentation Form. 11/22/24Following comments added due to adding and revising scope of the work at the time of resubmittal.Please see planning for adding new dryer room and converting existing storage room to cultivation room.Please see OCFA for adding new dryer room and converting existing storage room to cultivation roomSheet A-1, Provide exiting plan from cultivation area.Sheet A6.2, Please remove all attachment details if the roof top units are existing.Provide engineering calculation and detail for new drying room and ceiling.Sheet A-1, exit doors shall not be through a door that can be locked, exit cannot be from one cultivation room to the other cultivation room.Sheet A-1,Identify all the rooms on the new floor plan.Sheet A-1,Show all the double doors from sheet A-6 on the floor plan.Sheet A-5, Provide door numbers and door size. ( drawings shall be legible)11B-404.2.6, the distance between two hinged or pivoted doors in series shall be 48 inches minimum plus the width of the doors swinging into the space. ( show for flower room #3 and #4)Sheet A-6.2, clarify if new skylight fill in is part of this permit, if not please remove all the details.Provide engineering calculation and attachment detail for new walls over 14 feet tall.Provide ICC report or LA report for the insulated panels with span table.Provide engineering calculation to justify size of the panels.