Loading...
HomeMy WebLinkAbout320965_4_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101120983 PROJECT ADDRESS: 2501 S Garnsey St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, F-2, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/30/2024 INITIAL REVIEW 10/5/2024 EXPIRATION 3/29/2025 RECHECKS: 1.10/30/24 PROJECT APPLICANT CONTACT PERSON: 2.11/25/24 Randall Jepson 3. TEL: (714)336-9909 FAX: VALUATION: $400,000.00 EMAIL: randy@pjparch.com FLOOD ZONE: X-06059C0259J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.Structural Review Comment: Sheet S3: Reminder:Please provide two copies of updated structural calculation package and two sets of soil report for final approval.Foundation plan: Please submit foundation plan and details to the geotechnical engineer for review and approval. The geotechnical engineer shall “review” stamp the plan for conformance with the soil report recommendation. 2nd Review Comment: Please comply.3rd Review Comment: Final plan shall be submitted to the geotechnical engineer for review and approval. The geotechnical engineer shall “review” stamp the plan for conformance with the soil report recommendation.(End of Comment)