Loading...
HomeMy WebLinkAbout324176_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102122058 PROJECT ADDRESS: 1332 W Third St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/7/2025 INITIAL REVIEW 1/13/2025 EXPIRATION 7/6/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Eduardo Arrizon 3. TEL: (951)961-6084 FAX: VALUATION: $15,000.00 EMAIL: agconcreteconstruction@gmail.com FLOOD ZONE: X-06059C0257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet C-1Please switch sheets C-1 and G-1 so that project information is on first sheet of set. Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation. Provide the following design data on the first sheet (R106.1.1) ☐Sheet Index ☐Occupancy groups (R-3/U) ☐Type of construction (V-B) ☐Automatic Fire Sprinkler (YES or NO) ☐Number of stories. ☐Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☐Floor area per occupancy group, including the existing structure(s) ☒Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Sheet A-1Specify window types on Window Schedule (e.g. sliding, single hung, etc…)Provide detail for how RR connects to existing roof or wall where occurs.Specify Hip Beam size and end supports on Framing Plan.Provide detail for interaction at 2-2x8 Beam and Hip Beam.Verify water flow at interaction where 2x rafter spans to perpendicular rafter.Provide beam size for beam at post on right side post.Provide plywood sheathing information and nailing as occurs on plan.Provide 2-2x8 beam to existing wall.Switch detail references 2/D-1 and 3/D-1 on Framing Plan, they look to be incorrectly referenced.Provide new roofing information and ICC approval #. Noting to match existing does not suffice.Specify roof slope at all new roof slopes and show slope direction, it is unclear on plan.Provide framing information for kicker framing shown on Elevation above 2-2x8 beam.Provide connection information at top and bottom of 4x4 brace post.Verify beam above brace post shown on elevation. It is not found on framing plan, or not clear what this beam is.Revise FRAMING PLAN to ELEVATION at elevation view. Sheet D-1Detail 3 – Verify strap spacing with framing spacing specified on plan. Spacing does not look to work at specified locations where 32”oc strap is to be placed where 2x RR is spaced at 24”oc.(End of Comment)