Loading...
HomeMy WebLinkAbout323893_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101121974 PROJECT ADDRESS: 2907 S Oak St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/19/2024 INITIAL REVIEW 1/6/2025 EXPIRATION 6/17/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Martin Santos 3. TEL: (949)241-6933 FAX: VALUATION: $10,000.00 EMAIL: martin@sanboxco.com FLOOD ZONE: X-06059C0278J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Public Works Agency approval (647-5039). ☒Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet RS Provide the following design data on the first sheet ☐Sheet Index ☒Occupancy groups ☒Type of construction ☐Floor area per occupancy group, including the existing structure(s) ☒Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Sheet PPEnsure all hand written items are incorporated in resubmitted set (e.g. (N) noted at racks. Remove Index of Drawings provided on sheet, does not match cover sheet.Relocate Scope Of Work to first sheet.Provide and specify 44” minimum aisle widths between new racks. [CBC 11B-404.2.4]Provide and specify on plans all minimum clearances at door latch/hinge side adjacent to new racks where required. [CBC 11B-404.2.4](End of Comment)